Laserfiche WebLink
a CITY OF EVERETT <br />EVERETT Permit Services <br />WASHINGTON <br />MEMORANDUM <br />TO: Angie Kim Harmonious Capital Partners, LLC, (425)749-5557 <br />CC: Joe Taflin Navix Engineering, (425)458-7900 <br />FROM: Thad Newport I City of Everett Engineering/Permit Services, TNewport@everettwa.eov <br />DATE: 06/22/2022 <br />SUBJECT: Plan Review Comments for Public Works Permit Application <br />PROPOSAL: Deferred Wall Submittal Comments <br />LOCATION: 5900 361h AVE W <br />PERMIT #: PW1612-024 (Deferred Wall Submittal) <br />A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made and/or the following conditions <br />must be met: <br />Please see the compiled list of comments and redlines below to revise your plans accordingly, prior to resubmitting to Permit Services. Please respond to <br />comments in the table's response column provided. If you have any questions regarding the comments/redlines or need anything further, please directly <br />contact this project's Public Works reviewer, Thad Newport, at TNewport@everettwa.govmailto:TJorgenson@everettwa.gov. Please note that these <br />comments are compiled from Public Works reviewers for the Public Works (civil) plans only. The applicant team may receive a separate comment letter <br />from the Planning Reviewer for comments related to this construction permit, or from the Building Reviewer for architectural, structural, or other types <br />of drawings. <br />Resubmittal: Please send your electronic resubmittal to TNewport@everettwa.gov (email with a downloadable link to the electronic files) For more <br />instructions, see our permit application submittal & re -submittal Instructions (PDF). Lobby hours are Monday through Friday from 7:30am — 3:00pm. <br />Required resubmittal items are as outlined below: <br />i. Transmittal Sheet: (1) available at the Permit Services Lobby or online here: Transmittal sheet (PDF) for your use upon resubmittal. <br />ii. Plans: Revised Structural Plans- latest wall design responding to these comments. <br />iii. Geotech Report: Revised Geotech Report if needed <br />