My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 W MUKILTEO BLVD C HARBORS EDGE TOWNHOMES 2025-08-14
>
Address Records
>
W MUKILTEO BLVD
>
3710
>
HARBORS EDGE TOWNHOMES
>
3710 W MUKILTEO BLVD C HARBORS EDGE TOWNHOMES 2025-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 9:49:56 AM
Creation date
12/24/2024 10:05:35 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3710
Unit
C
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BTIL <br />ENGINEERING <br />SPECIAL INSPECTION - EXTERIOR SHEAR <br />Date: <br />March 14, 2024 <br />To: <br />Sage Homes <br />Attn: <br />Kayla Cutting <br />From: <br />Aiden Bernhardt <br />Project: Harbors Edge Townhomes <br />Building B (4-Plex) <br />Pages: 2 <br />19011 Wood-Sno Road NE, Suite 100 <br />Woodinville, WA 98072-4436 <br />Phone: (425) 814-8448 <br />Fax: (425) 821-2120 <br />BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br />nailing at 4" on center or less for the abovementioned project. The following Special Inspection Report includes a <br />summary of our site visit. <br />Construction Documents: <br />❑ Construction set dated 12/13/2023 <br />Progress of construction: <br />❑ Date of inspection: 03/11/2024 <br />❑ Foundation completed <br />❑ Framing completed <br />Items observed: <br />317d Floor Exterior Walls: <br />❑ Front P1-4 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />Note: (4) instances of the exterior wall sheathing not running through the specified corner were <br />observed at inspection. Builder has been notified and has provided pictures of the <br />resolution. Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />2nd Floor Exterior Walls: <br />❑ Front P1-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: <br />Note: (8) instances of the exterior wall sheathing not running through the specified corner were <br />observed at inspection. Builder has been notified and has provided pictures of the <br />resolution. Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />15t Floor Exterior Walls: <br />❑ Rear P2-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction Conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans: <br />Note: (6) instances of straps and blocking above garage pier per detail 4/S06 were not observed at <br />inspection. Builder has been notified and has provided pictures of resolution. Construction <br />conforms to plan set. <br />o Anchor bolt spacing: Construction conforms to plan set. <br />Note: Interior P2-2 sheathing panels were not observed at time of inspection. A follow up letter will be <br />provided when panels have been sheathed and nailed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.