Laserfiche WebLink
March 14, 2024 <br />❑ Front P1-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />o Anchor bolt spacing: Construction conforms to plan set. <br />Give me a call if you have any questions or comments. <br />Sincerely, <br />Aiden Bernhardt <br />BTL Engineering <br />9 Page 2 <br />