My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST 2 KAISER PERMANENTE 2025-01-27
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST 2 KAISER PERMANENTE 2025-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 8:20:12 AM
Creation date
12/31/2024 1:30:27 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Unit
2
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SER <br /> PER/ ANENTE <br /> Project <br /> Kaiser Permanente Everett <br /> MOB Backfill <br /> 2929 PINE STREET <br /> EVERETT,WA 98201 <br /> Prepared for <br /> KAISER FOUNDATION <br /> HEALTH PLAN, INC. <br /> NATIONAL FACILITIES SERVICES <br /> POST OFFICE BOX 12916 <br /> OAKLAND,CA 94604 <br /> PLUMBING SYMBOL SCHEDULE <br /> SYMBOL LEGEND SYMBOL LEGEND ABBREVIATIONS FIRE PROTECTION <br /> EXISTING PIPE Dd SHUT OFF VALVE,SEE SPECIFICATIONS FOR VALVE TYPE AAP AREA ALARM PANEL(MED.GAS) LA LAB AIR F FIRE MAIN PIPING <br /> EXISTING PIPE,FIXTURE OR EQUIPMENT TO BE REMOVED BUTTERFLY VALVE AD AREA DRAIN LAV LAVATORY AS AUTOMATIC FIRE SPRINKLER PIPING <br /> AFF ABOVE FINISHED FLOOR LB POUND , <br /> SOIL OR WASTE PIPING ABOVE FLOOR Db GLOBE VALVE CSP COMBINATION STANDPIPE <br /> AP ACCESSPANEL LV LAB VENT <br /> SOIL OR WASTE PIPING BELOW FLOOR b BALL VALVE WSP WET STANDPIPE <br /> ARCH ARCHITECTURAL LVAC LAB VACUUM <br /> -———————- VENT PIPING N CHECKVALVE AS AUTOMATIC FIRE SPRINKLER LW LAB WASTE SPD SPRINKLER DRAIN PIPING <br /> COLD WATER PIPING ANGLE VALVE AV ACID VENT MA MEDICALAIR FPT— FIRE PUMP TEST HEADER PIPING <br /> HOT WATER PIPING AW ACID WASTE MAI MEDICAL AIR INTAKE <br /> TEMPERATURE AND PRESSURE RELIEF VALVE BFF BELOW FINISHED FLOOR MAP MASTER ALARM PANEL(MED.GAS) Hellmuth,Obata&Kassabaum,Inc. <br /> --- HOTWATERRETURN PIPING FIRE PROTECTION GENERAL NOTES 1218 Third Avenue,Suite 1315 <br /> CD CONDENSATE DRAINAGE PIPING BALANCING VALVE BFG BELOW FINISHED GRADE MAX MAXIMUM <br /> Seattle,WA 98101 USA <br /> BHP BRAKE HORSEPOWER MBH THOUSAND BTU PER HOUR 1. THE AUTOMATIC SPRINKLER SYSTEM SHALL CONFORM TO THE REQUIREMENTS OF THE It+1 206 493 1771 f+1 206 493 1778 <br /> SD STORM DRAIN a, GAS COCK VALVE BV BALANCING VALVE MG NATURAL GAS-MEDIUM PRESSURE CURRENT EDITION OF THE NFPA 13.PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE- <br /> STOPPED,FIRE-STOPPING SHALL BE AN APPROVED MATERIAL,INSTALLATION OF THE All raPrPd—i—&intellactual P Peror rights rasan as <br /> --SD-- STORM DRAIN BELOW FLOOR RPBP CA COMPRESSED AIR MIN MINIMUM SYSTEM SHALL NOT BE STARTED UNTIL COMPLETE PLANS AND SPECIFICATIONS(INCLUDING 2020 <br /> REDUCED PRESSURE BACKFLOW PREVENTER WATER SUPPLY INFORMATION AND TYPE OF EXISTING SPRINKLER SYSTEM,IF ANY)HAVE In Association with <br /> OFD OVERFLOW DRAINAGE PIPING CD CONDENSATE DRAIN MV MEDICAL VACUUM BEEN APPROVED BY THE AUTHORITY HAVING JURISDICTION.AT VARIOUS STAGES AND UPON <br /> PRESSURE REGULATING VALVE CFF CAPPED FOR FUTURE CONNECTION MVE MEDICAL VACUUM EXHAUST COMPLETION,THE SYSTEM MUST BE TESTED IN THE PRESENCE OF THE ENFORCING <br /> TW TEMPERED WATER AGENCY. MOrtenson <br /> IW INDIRECT WASTE PRESSURE REDUCING VALVE ASSEMBLY <br /> CFM CUBIC FEET PER MINUTE N2 NITROGEN 2. COORDINATE LOCATIONS OF ALL SPRINKLER HEADS WITH THE ARCHITECTURAL REFLECTED General Contractor CHV CHECK VALVE N20 NITROUS OXIDE CEILING PLANS AND ELECTRICAL LIGHTING LAYOUT.PRIOR T FABRICATION,SUBMIT LAYOUT 10230 NE Points Drive,Suite 300 <br /> DRAWINGS FOR ARCHITECTURAL ACCEPTANCE.COORDINARDINATEE LOCATIONS OF ALL SPRINKLER Kirkland,WA 98033 <br /> SOLENOID VALVE COND CONDENSATE (N) NEW MAINS,BRANCH PIPING,ETC.WITH OTHER TRADES. <br /> 3. SPRINKLER HEAD TOLERANCE IN CEILING TILES IS-V FROM CENTER OF TILE. <br /> GENERAL NOTESetti <br /> OS&YVALVE CONN CONNECTION NC NORMALLY CLOSED 4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS OR FITTINGS REQUIRED. MEP?FP Englneedng <br /> CONT CONTINUATION NO NORMALLY OPEN THE FIRE SPRINKLER CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES TO AVOID <br /> 1. ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE PLUMBING CODE, ------ ~ STRAINER CONFLICTS WITH DUCTS,LIGHTS,FIXTURES,PIPING,ETC. 2013 4th Avenue,Suite 200 <br /> CBS CLINICAL SERVICE SINK NO. NUMBER 5. THE FIRE SPRINKLER CONTRACTOR IS TO COORDINATE WITH THE UNDERGROUND SITE Seattle,WA 98121 <br /> BUILDING CODE,NATIONAL FIRE PROTECTION CODE,AND ALL OTHER APPLICABLE CODES AND STRAINER WITH HOSE BIBB UTILITIES CONTRACTOR.THE UNDERGROUND FIRE MAIN PIPING SHALL BE INCLUDED ON <br /> REGULATIONS AS CURRENTLY ADOPTED BY AUTHORITY HAVING JURISDICTION. CSP COMBINATION STANDPIPE OFD OVERFLOW DRAIN SPRINKLER SHOP DRAWINGS AND CALCULATIONS SUBMITTED TO THE LOCAL FIRE MARSHALL <br /> OR NSTALLATION.PROVIDE ALL FITTINGS,OFFSETS 2. COORDINATE PLUMBING SYSTEMS WITH WORK ETS AND TRANSITIONS AS REQUIRED FOR OTHER TRADES PRIOR TO ANY FABRICATION D-} HOSE BIBB CTE CONNECT TO EXISTING OFCI OWNER FURNISHED CONTRACTOR INSTALLED FOR APPROVAL. <br /> I 6. THE SPACING AND DETAILS OF THE SUPPORT AND BRACING OF THE FIRE SPRINKLER PIPING <br /> COMPLETE WORKABLE INSTALLATION. ■ CU.FT. CUBIC FEET OS&Y GV OUTSIDE STEM AND YOKE GATE VALVE SHALL COMPLY WITH THE CURRENT EDITION OF NFPA 13.PROVIDE ANCHORAGE DETAILS <br /> 3. COORDINATE LOCATIONS OF ALL ROOF OPENINGS WITH STRUCTURAL,MECHANICAL AND T SHOCK ABSORBER(WATER HAMMER ARRESTOR) AND CALCULATIONS FOR THE CONNECTION OF SWAY BRACING TO THE STRUCTURE.DESIGN <br /> ARCHITECTURAL PLANS PRIOR TO ANY INSTALLATION. CU.IN. CUBIC INCHES PAS PRE-ACTION AUTOMATIC SPRINKLER LOADS FOR THE ANCHORAGE MAY BE COMPUTED PER NFPA 13,CURRENT EDITION.ALL SHOP <br /> 4. PLATFORMS,CURBS AND FLASHINGS FOR PLUMBING EQUIPMENT SHALL BE AS INDICATED ON THE ❑FS FLOW SWITCH CW COLD WATER PD PUMPED DISCHARGE DRAWINGS OF THE SPRINKLER SYSTEM SHALL BE SUBMITTED TO THE AUTHORITY HAVING <br /> STRUCTURAL AND ARCHITECTURAL PLANS,UNLESS NOTED OTHERWISE.COORDINATE EXACT JURISDICTION FOR REVIEW AND APPROVAL,PRIOR To INSTALLATION. <br /> SIZES OF REQUIRED OPENINGS AND SUPPORTS FOR FURNISHED EQUIPMENT. OF DRINKING FOUNTAIN PG PRESSURE GAUGE <br /> 5. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT 4TS TAMPERSWITCH DFU DRAINAGE FIXTURE UNITS POC POINT OF CONNECTION <br /> MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE CODES.PROVIDE ALL FITTINGS, <br /> TRANSITIONS,VALVES AND OTHER DEVICES REQUIRED FOR A COMPLETE WORKABLE METER CIA DIAMETER PRV PRESSURE REDUCING VALVE ASSEMBLY <br /> INSTALLATION. <br /> 6. MAINTENANCE LABEL SHALL BE AFFIXED TO ALL PLUMBING EQUIPMENT AND A MAINTENANCE DI DEIONIZED WATER PSI POUNDS PER SQUARE INCH PLUMBING DRAWING INDEX <br /> MANUAL SHALL BE PROVIDED TO OWNER'S REP. PRESSURE GAUGE Key Plan <br /> 7. PIPES SHALL BE SUPPORTED AND BRACED PER SMACNA"GUIDELINES FOR SEISMIC RESTRAINTS DW DISHWASHER PWR PURE WATER RETURN <br /> OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS." ) THERMOMETER (E) EXISTING PWS PURE WATER SUPPLY B1 P001 PLUMBING COVER SHEET <br /> B. HOUSEKEEPING PADS SHALL BE 4 INCHES HIGH WITH A MINIMUM OF 6 INCHES BEYOND B1 PW2 PLUMBING 2018 WSEC COMPLIANCE AND EQUIPMENT SCHEDULES <br /> EQUIPMENT(INTERIOR ONLY). FLEXIBLE CONNECTION EEW EMERGENCY EYE WASH R RELOCATE OR RELOCATED B1 PD10P1 DEMO PLUMBING FLOOR PLAN-LEVEL PI-AREAE <br /> EL ELEVATION RD ROOF DRAIN Bi PD102F DEMO PLUMBING FLOOR PLAN-LEVEL 2-AREA F <br /> ------ill-- UNION ESH EMERGENCY SHOWER ROS REVERSE OSMOSIS WATER SUPPLY B1P20P1 PLUMBING FLOOR PLAN-LEVEL Pi-AREAE <br /> A F <br /> REDUCER ROR REVERSE OSMOSIS WATER RETURN B1 P202F PLUMBIOTECTINNG FLOOR PLOOR PLAN-LEVEPI <br /> EN EEWIESH TEMPERING VALVE B1 F30P1 FIRE PROTECTION FLOOR PLAN-LEVEL P1-AREA E <br /> DIRECTION FLOW EWC ELECTRIC WATER COOLER RPBP REDUCED PRESSURE BACKFLOW PREVENTER B1 F301E FIRE PROTECTION FLOOR PLAN-LEVEL 1-AREA E <br /> B1 F302E FIRE PROTECTION FLOOR PLAN-LEVEL 2-AREA E <br /> PIPE ANCHOR F FIRE MAIN RPM REVOLUTIONS PER MINUTE 81F302F FIRE PROTECTION FLOOR PLAN-LEVEL 2-AREA F <br /> PIPE UP FCO FLOOR CLEANOUT S SOIL OR WASTE B1 P801 PLUMBING SPECIFICATIONS <br /> FCV FLOW CONTROL VALVE SD STORM DRAINAGE <br /> J PIPE DOWN <br /> FD FLOOR DRAIN SOV SHUT-OFF VALVE IN RISER <br /> VALVE IN VERTICAL <br /> FHC FIRE HOSE CABINET SK SINK Professional Seals <br /> PIPE CONNECTION,TOP FHV FIRE HOSE VALVE SPD SPRINKLER DRAIN W. <br /> FIN.FLR. FINISHED FLOOR SQUARE FEET <br /> J. PIPE CONNECTION,BOTTOM FOT FUEL OIL TANK SQ.FT. SQUARE FEET <br /> Q.�OF <br /> FPT FIRE PUMP TEST SS SANITARY SEWER <br /> CAPPED PIPE uFi z <br /> PIPE SLEEVE FS FLOOR SINK SSC SURGEON'S SCRUB SINK <br /> I WALL 8 2 <br /> CLEANOUT <br /> FT FEET SW SOFTENED WATER p <br /> G NATURAL GAS TDL TOTAL DEVELOPED LENGTH OF PIPE 2CIS4 <br /> FLOOR CLEANOUT GAL GALLON TP TRAP PRIMER TONALL <br /> GRADE CLEANOUT GCO GRADE CLEANOUT TS TAMPER SWITCH <br /> No. Description Data <br /> T MEDICAL GAS ALARM PRESSURE SWITCH GPM GALLONS PER MINUTE TW TEMPERED WATER MOB BACK FILL ISSUED FOR PERMIT 2022/10/14 <br /> II MEDICAL GAS ZONE VALVE BOX GV GATE VALVE TYP TYPICAL <br /> GW GREASE WASTE UON UNLESS OTHERWISE NOTED <br /> II MEDICAL GAS ALARM PANEL <br /> GWS GRAY WATER SYSTEM UR URINAL <br /> FLOOR SINK(FULL GRADE)(HALF GRATE) HE HOSE BIBB V VENT <br /> FD-1 FLOOR DRAIN HP HORSEPOWER VTR VENT THROUGH ROOF <br /> ®— <br /> HW HOT WATER W WASTE <br /> RD-1 9FD-1 HWR HOT WATER RETURN WAGD WASTE ANESTHETIC GAS DISPOSAL <br /> G @ ROOF DRAINI OVERFLOW DRAIN HZ HERTZ WC WATER CLOSET <br /> POINT OF CONNECTION IA INSTRUMENTAIR Woo WALL CLEANOUT <br /> ICW INDUSTRIAL/NON-POTABLE COLD WATER WH WATER HEATER <br /> OSHEET NOTE DESIGNATION IEWH INSTANTANEOUS ELECTRIC WATER HEATER WHA WATER HAMMER ARRESTER <br /> EQUIPMENT DESIGNATION IHW INDUSTRIAL/NON-POTABLE HOT WATER WHB WALL HYDRANT BOX <br /> EQPT EQUIPMENT IHWR INDUSTRIAL/NON-POTABLE HOT WATER RETURN WSFU WATER SUPPLY FIXTURE UNITS <br /> NUMBER <br /> IN INCHES I WSP WET STANDPIPE <br /> DETAIL REFERENCE BUBBLE I.E. INVERT ELEVATION ZVB ZONE VALVE BOX-MEDICAL GAS <br /> 1 DETAIL NUMBER <br /> X.X SHEET BEARING DETAIL IW INDIRECT WASTE <br /> KW KILOWATT <br /> KIP Project No: CAP022248 <br /> HOK Project No: 20.05003.00 <br /> Sheet Title: <br /> PLUMBING COVER <br /> SHEET <br /> original is 30 x 42 D. [s&this drawing. <br /> Sheet Number <br /> B1 P001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.