|
•
<br /> KAER
<br /> PER ANENTE
<br /> Project
<br /> Kaiser Permanente Everett
<br /> MOB Backfill
<br /> 2929 PINE STREET
<br /> MECHANICAL SYMBOL SCHEDULE EVERETT,WA98 01
<br /> SYMBOL LEGEND GENERAL NOTES GENERAL CONDITIONS ABBREVIATIONS Prepared for
<br /> KAISER FOUNDATION
<br /> 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS. 1. ALL WORK TO BE IN ACCORDANCE WITH REQUIREMENTS OF GOVERNING LOCAL FIRE CODES AND BUILDING EAT ENTERING AIR TEMP. HR HOUR(S)
<br /> - MATCH LINE SOLENOID VALVE CODES. EDB ENTERING DRY BULB TEMP HT HUMIDITY TRANSMITTER
<br /> SHALL HEALTH PLAN, INC.
<br /> .
<br /> 2. EVENT BETWEEN CONTRACT DRAWINGS AND SPECIFICATIONS,THE MOST STRINGENT HTP HEAT PUMP NATIONAL FACILITIES SERVICES
<br /> SHALL GOVERN. 2. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS.NOTIFY ARCHITECT OF ANY DISCREPANCIES FOUND. EF EXHAUST FAN
<br /> VERIFY DIMENSIONS OF ALL OWNER-FURNISHED OPERATING EQUIPMENT TO ENSURE PROPER COORDINATION POST OFFICE BOX 12916
<br /> 3. PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING STATE AND LOCAL CODES. WITH CONSTRUCTION. EFF EFFICIENCY HVAC HEATING,VENTILATING
<br /> EF AND AIR CONDITIONING OAKLAND,CA 94604
<br /> 1 EQUIPMENT TAG RADIUS ELBOW,RID=1.5 UNLESS NOTED OTHERWISE ET EXPANSION TANK
<br /> 4. INSTALL ALL PIPING AND DUCTWORK TO AVOID ARCHITECTURAL FRAMING,STRUCTURAL MEMBERS,AND OTHER 3. SCHEDULE ALL WORK ACCESS AND STORAGE WITH THE FACILITY ADMINISTRATOR.
<br /> OBSTRUCTIONS.COORDINATE PIPING AND DUCTWORK LOCATION WITH ALL APPLICABLE CONTRACT DRAWINGS EWB ENTERING WET BULB HWR HEATING WATER RETURN
<br /> PRIOR TO PLACING SLEEVES IN FLOORS OR WALLS. 4. CONTRACTOR SHALL PROVIDE DUST COVERS AS REQUIRED TO CONTAIN DUST AND DEBRIS WITHIN EWT ENTERING WATER TEMP. HWS HEATING WATER SUPPLY
<br /> CONSTRUCTION AREA AND KEEP DIRT AND DUST TO A MINIMUM.
<br /> POINT OF CONNECTION,NEW WORK TO EXISTING WORK 5. INSTALL ALL PIPING AND DUCTWORK BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE INSTALLATION EXH EXHAUST HX HEAT EXCHANGER
<br /> DUCT MOUNTED COIL WORK OF OTHER TRADES.THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT 5. ALL REMOVED ITEMS DEEMED TO HAVE VALUE BY THE OWNER SHALL BE DELIVERED TO A PLACE OF STORAGE
<br /> LOCATIONS OF PIPING OR DUCTWORK. AT THE SITE AS DIRECTED.ALL OTHER ITEMS MUST BE DISPOSED OF OFF SITE IN A LEGAL MANNER. EXP EXPANSION IAC INSTRUMENT AIR COMPRESSOR
<br /> 6. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT DIFFUSER LOCATIONS AND FINISHED CEILING. °F DEGREES FAHRENHEIT AS INSTRUMENT AIR SUPPLY
<br /> POINT OF DISCONNECTION 6. WHERE EXISTING CONSTRUCTION IS CUT,DAMAGED,OR REMODELED,PATCH WITH MATERIALS TO MATCH IN
<br /> ' KIND,QUALITY AND PERFORMANCE. F FILTER ID INSIDE DIMENSION
<br /> .
<br /> �- 7. COORDINATE DUCTWORK,PIPING WITH STRUCTURAL DRAWINGS,LIGHTING AND SPRINKLER SYSTEM.PROVIDE (F) FUTURE TEMP TEMPERATURE
<br /> SHOWN IN ORDER(LEFT TO RIGHT):FIRE TRANSITIONS AS REQUIRED. 7. CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR SAFETY OF ALL PERSONS ON OR ABOUT THE
<br /> DEVICE DAMPER(FD)/SMOKE DAMPER(SD)/ CONSTRUCTION SITE IN ACCORDANCE WITH APPLICABLE LAWS AND CODES.GUARD ALL HAZARDS IN FC FLEXIBLE CONNECTION TOP TOP OF PIPE
<br /> AIR OUTLET/ i� B. COORDINATE LOCATIONS OF ACCESS DOORS WITH F.D.'S,V.D.'S,SO,ETC.THE OPENING SHALL BE LARGE ENOUGH
<br /> SD-1 SD-1 12X12 r NECK SIZE OPTIONAL(IF COMBINATION FIRE SMOKE DAMPER(FSD) ACCORDANCE WITH THE SAFETY PROVISIONS OF THE LATEST MANUAL OF ACCIDENT PREVENTION PUBLISHED
<br /> INLET DEVICE TO PERMIT MAINTENANCE AND RESETTING OF THE DEVICE. FCU FAN COIL UNIT TOR TOP OF RACK
<br /> 550 DESIGNATION 550 NOT GIVEN REFER)TO BY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA.
<br /> SCHEDULE) FD FIRE DAMPER OR FLOOR DRAIN TOT TOTAL
<br /> AIRFLOW(CFM) 9. CONTRACTOR TO ACCOSIBLE EI WITH ARCHITECTS CEILING ACCESS PANELS FOR ALL FIRE,SMOKE AND VOLUME 8. CLEAN ALL EXPOSED SURFACES AND NEW EQUIPMENT AFTER COMPLETION.
<br /> DAMPERS IN INACCESSIBLE CEILING AS REQUIRED. FLA FULL LOAD AMPS TT TEMP.TRANSMITTER
<br /> f NEW WORK (DTU-01 ROOM SENSOR OR THERMOSTAT(WITH ZONE OR 9. WHEN INSTALLING DRILLED-IN ANCHORS ANDIOR POWDER DRIVEN PINS IN EXISTING NON-PRESTRESSED FUR FLOOR TYP TYPICAL
<br /> EQUIPMENT DESIGNATION WERE APPLICABLE) 10. WHETHER OR NOT THEY ARE SHOWN ON DRAWINGS PROVIDE ALL CONCRETE PADS,SPECIAL SUPPORTS AND REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING
<br /> f f EXISTING WORK TO REMAIN ANCHORING FOR ALL MECHANICAL EQUIPMENT REQUIRING SUCH.SEE ARCH OR STRUCTURAL DRAWINGS FOR REINFORCING BARS.MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE FPI FINS PER INCH U.C. UNDERCUT
<br /> --'� ROOM SENSOR OR THERMOSTAT(WITH LEADER TO ADDITIONAL INFO. DRILLED-IN ANCHOR AND/OR PIN. Hellmuth,Obata&Kassabaum,Inc.
<br /> i EXISTING WORK TO BE REMOVED RELATED EQUIPMENT 11. ALL DUCT DIMENSIONS ARE AIRSTREAM DIMENSIONS. FPM FEET PER MINUTE JOINUNLESS OTHERWISE NOTED 1218 Third Avenue,Suite 1315
<br /> HUMIDITY SENSOR(WITH ZONE OR EQUIPMENT FPS FEET PER SECOND V VOLT Seattle,WA 98101 USA
<br /> S ri BOTTOM/UP PIP '®2 DESIGNATION WERE APPLICABLE 12. ALL MECHANICAL RELATED PENETRATIONS THROUGH ROOF SHALL HAVE CURBS INSTALLED BY ROOFING ABBREVIATIONS t+1 206 493 1771 f+1 206 493 1778
<br /> E CONNECTION HUMIDITY SENSOR(WITH LEADER TO RELATED CONTRACTOR TO ENSURE A PROPER WATERPROOF SEAL. FS FLOOR SINK VA VALVE
<br /> EQUIPMENT ABV ABOVE IN INCHES FT FEET VAV VARIABLE AIR VOLUME All raaroa„oror,s inlellactual oroaanv riahla rasar•.aa
<br /> 13. SEAL ALL FIRE RATED PENETRATIONS WITH UL LISTED THROUGH PENETRATION ASSEMBLY AS SPECIFIED.REFER TO 2020
<br /> PUMP(FOR DIAGRAMMATIC SD ACU AIR CONDITIONING UNIT INV INVERT ELEVATION FV FACE VELOCITY VERT VERTICAL
<br /> ) ARCHITECTURAL. In Association with
<br /> DUCT SMOKE DETECTOR(SHOWN HERE TO BE ACC AIR COOLED CHILLER KW KILOWATT GA GAGE OR GAUGE VFD VARIABLE FRED.DRIVE
<br /> Dp GLOBE VALVE 14. THERMOSTAT AND HUMIDISTAT APPEARANCE AND LOCATION SHALL BE COORDINATED WITH ARCHITECTS/OWNER.
<br /> FURNISHED BY ELECTRICAL) AD ACCESS DOOR KWH KILOWATT HOUR GPM GALLONS PER MINUTE VOL VOLUME Mortensen
<br /> Fl CHECK VALVE SD 15. PROVIDE REMOTE OPERATORS FOR ALL VOLUME DAMPERS LOCATED ABOVE INACCESSIBLE CEILING. GPH GALLONS PER HOUR W WATTS General Contractor
<br /> AFF ABOVE FINISHED FLOOR LAT LEAVING AIR TEMP. 10230 NE Points Drive,Suite 300
<br /> iZl STOP CHECK VALVE ® CEILING SUPPLY DIFFUSER 16. PROVIDE OPERATING HANDLES FOR ALL VALVE AND COCKS WITHOUT INTEGRAL OPERATORS. AFMS AIR FLOW MEASURING STATION LBS POUNDS GSM GALVANIZED SHEET METAL WE WET BULB Kirkland,WA 98033
<br /> 17. IN MECHANICAL OR EQUIPMENT ROOMS,INSTALL ALL VALVES ACCESSIBLE FROM FLOOR LEVEL WHERE POSSIBLE. AHU AIR HANDLING UNIT LID LINEAR DIFFUSER HC HEATING COIL W/o WITHOUT
<br /> CALIBRATED FLOW BALANCE VALVE CEILING RETURN REGISTER OR GRILLE PROVIDE GUIDED CHAIN OPERATIONS,UNLESS OTHERWISE NOTED,ON ALL VALVES IN MECHANICAL AND EQUIPMENT Mazzetti
<br /> ® ROOMS INSTALLED OVER 7'ABOVE FLOOR. AL ACOUSTICAL LINING LPR LOW PRESSURE STEAM RETURN HO HEAD Wr WEIGHT MEP+FP Englneedng
<br /> iZr FLOW LIMITING VALVE CEILING EXHAUST REGISTER OR GRILLE
<br /> ALT ALTITUDE LIPS LOW PRESSURE STEAM SUPPLY HGT HEIGHT WrR WATER 2013 4th Avenue,Suite 200
<br /> HOSE END BALL VALVE WITH CAP AND CHAIN .� c DIFFUSER,REGISTER OR GRILLE THROW INDICATOR(SUPPLY, 18. PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS LINE SIZE SHOWN UNLESS OTHERWISE NOTED. ALD AUTOMATIC LOWER DAMPER LVR LOUVER HOA HAND,OFF,AUTO WSR WALL SUPPLY REGISTER Seattle,WA 98121
<br /> �r�� BUTTERFLY VALVE T 19. INSTALL SWING CHECK VALVES IN THE HORIZONTAL POSITION. APPROX APPROXIMATE LWr LEAVING WATER TEMP.
<br /> SUPPLY REGISTER OR GRILLE HP HORSEPOWER WRR WALL RETURN REGISTER
<br /> i 20. PROVIDE 3/8"BLOW-OFF VALVE AND 11T IPS TO HOSE THREAD ADAPTER ON ALL STRAINERS. ARCH ARCHITECTURAL M MAIN AIR
<br /> PITOT LOCATION iq- RETURN OR EXHAUST REGISTER OR GRILLE 21. UNLESS OTHERWISE INDICATED ON THE DRAWINGS,ALL HOT WATER SUPPLYIRETURN TAKE-OFFS TO REHEAT COIL AS AIR SEPARATOR QM MAGNETIC GAUGE
<br /> pq 2-WAY MODULATING CONTROL VALVE 1T� FOR AIR TERMINAL BOXES SHALL BE 3/4"DIAMETER. AVG AVERAGE MA MAKE UP AIR MECHANICAL DRAWING INDEX
<br /> I ? SLOPING RISE OR DROP IN RECTANGULAR DUCTWORK
<br /> 22. ALL DUCT HEATING COILS SHALL HAVE DUCT ACCESS PANEL. B BOILER MAT MIXED AIR TEMPERATURE gi M001 MECHANICAL COVER SHEET
<br /> p� 2-WAY 2-POSITION CONTROL VALVE 23. PROVIDE UNIONS OR FLANGES ON EACH SIDE OF CONTROL VALVES AND PUMPS EVERY PIPING ASSEMBLY SHALL BE BD SLOWDOWN MAX MAXIMUM Bi M011 MECHANICAL 2018 WSEC COMPLIANCE AND EQUIPMENT SCHEDULES
<br /> .
<br /> I I SLOPING RISE OR DROP N ROUND DUCTWORK MADE SO AS TO MAKE EVERY VALVE AND PIECE OF EQUIPMENT EASILY REMOVABLE.WELDED OR SOLDER-JOINT BDD BACK DRAFT DAMPER MBO MANUAL BALANCING DAMPER B1 MD10P1 DEMO HVAC FLOOR PLAN-LEVEL P1-AREA E
<br /> 3-WAY MODULATING CONTROL VALVE VALVES ARE EXCEPTED FROM THIS REQUIREMENT. Bi MD101E DEMO HVAC FLOOR PLAN-LEVEL/-AREAS
<br /> BF BELOW FLOOR MBH THOUSAND BTUIHOUR B1 MD102E DEMO HVAC FLOOR PLAN-LEVEL 2-AREA E
<br /> f 24. PROVIDE LOCAL INDICATOR LIGHTS FOR ALL SMOKEIFIRE DAMPERS.LIGHT IS ACTIVATED WHEN DAMPER IS IN gFW BOILER FEEDWATER MCC MOTOR CONTROL CENTER Bi MD102FEDEMOAC FLOOR PLAN-LEVEL 2-AREA F Key Plan
<br /> 3-WAY 2-POSITION CONTROL VALVE �18x12 CLOSED POSITION. Bi M20P1OR PLAN-LEVEL P1-AREAE
<br /> RECTANGULAR DUCT,SIZE BASED ON CLEAR BG BELOW GRADE MFG MANUFACTURERINSIDE DIMENSIONS,FIRST FIGURE INDICATES 25. ALL DRAIN CONNECTIONS FROM MECHANICAL EQUIPMENT SHALL BE PIPED TO SPILL DIRECTLY INTO NEAREST FLOOR B1 M201EOR PLAN-LEVEL 1-AREA E
<br /> PLAN SIZE BHP BRAKE HORSEPOWER MIN MINIMUMRELIEFVALVE/ANGLE VALVE IIDRAIN. Bi M202EOR PLAN-LEVEL2-AREAS
<br /> BO BLANK OFF MMS MANUAL MOTOR START B1 M202FOOR PLAN-LEVEL 2-AREAF
<br /> 26. PROVIDE 1"AIR GAP AT ALL DRAIN CONNECTIONS. Bi M601ICALDETAILS AND DIAGRAMS
<br /> PRESSURE REDUCING VALVE(PRV) ig0 BOD BOTTOM OF DUCT (N) NEW Bi M701ICAL CONTROLS
<br /> S 27. ALL PIPING AND DUCTWORK PASSING THROUGH SEPARATION JOINTS USED AS BUILDING SEISMIC SEPARATIONS B1 M801ICAL SPECIFICATIONS
<br /> TAV ROUND DUCT,DIAMETER SIZE BASED ON BOP BOTTOM OF PIPE NIA NOT APPLICABLE
<br /> CLEAR INSIDE DIMENSIONS SHALL HAVE FLEXIBLE CONNECTIONS TO COMPENSATE FOR SEISMIC MOVEMENT AS REQUIRED.PROVIDE HANGERS
<br /> THERMOSTATIC AIR VENT(AIR SYSTEMS) 180 ON EACH SIDE OF FLEXIBLE CONNECTION. BOR BOTTOM OF RACK INC NORMALLY CLOSED
<br /> i PRESSURE GAUGE,STEAM SYSTEMS 28. SEPARATE ALL CEILING HANGING AND BRACING WIRES AT LEAST 6"FROM ALL UNBRACED DUCTS,PIPES,CONDUITS, BTU BRITISH THERMAL UNIT NIC NOT IN CONTRACT
<br /> 24100,, x ETC.AT THE CONTRACTOR'S OPTION HE MAY BRACE UNBRACED DUCTS,PIPES,CONDUITS,ETC.IN A MANNER BTUH BTU PER HOUR INK NECK
<br /> ( FLAT OVAL DUCT,SIZE BASED ON CLEAR INSIDE CONFORMING TO REQUIREMENTS ESTABLISHED BY THE MECHANICAL AND ELECTRICAL CONTRACT DOCUMENTS,OR
<br /> f PRESSURE GAUGE,HYDRONIC SYSTEMS DIMENSIONS,FIRST FIGURE INDICATES PLAN SIZE THE CONTRACTOR MAY INSTALL TRAPEZE SUPPORTS TO RECEIVE THE CEILING HANGING AND BRACING WIRES.THE C COMMON NO NORMALLY OPEN OR NUMBER
<br /> 24x100 GENERAL CONTRACTOR SHALL COORDINATE THE WORK AND RESPONSIBILITY FOR ACCOMMODATING SUCH WORK.
<br /> CA COMPRESSED AIR NTS NOT TO SCALE
<br /> VB VACUUM BREAKER 29. PROVIDE BALANCING DAMPERS AT EACH SUPPLY,RETURN,AND EXHAUST BRANCH TAKE-OFF.
<br /> iBx12 AL CAV CONSTANT VOLUME CA OUTSIDE AIR
<br /> F:-�-__Y Professional Seals
<br /> ACOUSTIC LINING IN DUCT(SIZE NOTED INDICATES 30. DUCTS ON THE CONSTRUCTION SITE SHALL BE PROTECTED AND ISOLATED FROM DUST CONTAMINATION.THIS SHALL CC COOLING COIL OBD OPPOSED BLADE DAMPER
<br /> FLOW METER(INSTANTANEOUS FLOW) 18x12_ INSIDE CLEAR DIMENSIONS) INCLUDE DUCTWORK THAT IS PARTIALLY INSTALLED.IF DUCTWORK IS TO REMAIN OPEN TO THE CONSTRUCTION CD CEILING DIFFUSER OD OUTSIDE DIMENSION W.
<br /> ENVIRONMENT FOR MORE THAN A FEW HOURS,PROVIDE ATEMPORARY SEAL ON THE DUCT. Yi.
<br /> f--M - � TOTALIZING FLOW METER BDD SGD CE CEILING EXHAUST ORD OVERFLOW ROOF DRAIN Q4 og w,>s
<br /> T 31. ALL DUCT ELBOWS BEFORE AIR TERMINAL BOXES AND REHEAT COILS SHALL BE OF FULL RADIUS HARD CONNECTION
<br /> T�� BACK DRAFT DAMPER/ ELBOWS. CFF CAP FOR FUTURE AP PRESSURE DROP OR Fe o
<br /> FM BTU METER ' BOG SGD CFH CUBIC FEET PER HOUR DIFFERENTIAL % z
<br /> SLIDE GATE DAMPER 32. ALL PIPING AND DUCTWORK TO BE FLEXIBLE CONNECTED TO ROTATING EQUIPMENT:INCLUDING BUT NOT LIMITED TO
<br /> FANS,AHU'S,PUMPS AND AT ALL COILS,ETC. CFM CUBIC FEET PER MINUTE P PUMP 24672 9
<br /> i El f. PIPE SLIDE �j 33. SEE ARCHITECTURAL AND STRUCTURAL DOCUMENTS FOR EQUIPMENT SUPPORTS AND ROOF OPENINGS. CG CEILING GRILLE PC PUMPED CONDENSATE 'CISTEt�'�1}
<br /> CHANGE IN PIPE SIZE,CONCENTRIC REDUCER s--� I--� SUPPLY DUCT TURNING UP.(IN ORDER SHOWN. CHS CHILLED WATER PG PIPE GUIDE lONAL '
<br /> UNLESS SPECIFIED DIFFERENTLY RECTANGULAR,FLAT OVAL&ROUND) 34. PROVIDE ELBOW SUPPORTS AT ALL PIPE CONNECTIONS TO EQUIPMENT.
<br /> CHR CHILLED WATER RETURN pH PHASE(ELECTRICAL)
<br /> 35. SEE ARCHITECTURAL DOCUMENTS FOR PAINTING OF ALL EXPOSED DUCTWORK,PIPING,AIR OUTLET AND FIXTURE CENTERLINE PHC PREHEAT COIL No. Description Data
<br /> CAPPED PIPE TRIM.ALL DUCTWORK AND PIPING ON MECHANICAL EQUIPMENT LEVEL(ROOF)IS TO BE PAINTED IN COMPLIANCE G-
<br /> MOB BACK FILL ISSUED FOR PERMIT 2022/10/14
<br /> SUPPLY DUCT TURNING DOWN.(IN ORDER SHOWN. WITH DIVISION 15 AND DIVISION 9. CMPR COMPRESSOR POC POINT OF CONNECTION
<br /> f � WYE TYPE STRAINER WITH HOSE END BLOW OFF VALVE x 36. INSTALL SHUT-OFF VALVES AT EACH BRANCH PIPE LINE.(T'F�'T RECTANGULAR,FLAT OVAL&ROUND) CO CLEAN OUT(DOOR) PRESS PRESSURE
<br /> �O S�LViJ/YUI_IY..�'1
<br /> 37. ALL DUCT SMOKE DETECTORS TO BE PROVIDED AND WIRED BY DIVISION 26,INSTALLED BY DIVISION 23.DETECTOR COEFF COEFFICIENT PSI POUNDS/SQUARE INCH
<br /> f--I � NNE TYPE STRAINER �-11/�� '_//�,� SAMPLING TUBES TO HAVE AN ACCESS DOOR MAKING SAMPLING TUBES READILY ACCESSIBLE. COND CONDENSATE
<br /> VJ `L/ RETURN DUCT TURNING UP.(IN ORDER SHOWN. PSIG POUNDS PER SQUARE INCH GAUGE
<br /> REDUCED PRESSURE BACKFLOW PREVENTER RECTANGULAR&ROUND) 38. UNLESS SPECIFICALLY SPECIFIED OR SHOWN OTHERWISE ALL CONSTRUCTION IS TO CONFORM TO SMACNA HVAC CONN CONNECTION,CONNECT R RISE
<br /> BLIND FLANGE
<br /> yU�(Y/J, CONSTRUCTION STANDARDS AS A MINIMUM REQUIREMENT. CONT CONTINUATION RA RETURN AIR
<br /> 39. FIRE DAMPERS AND FIRE SMOKE DAMPERS ARE TO BE INSTALLED IN RATED PORTION OF THE ASSEMBLIES IN WHICH COP COEFF.OF PERFORMANCE RAID RETURN AIR DUCT
<br /> ,,T,.?
<br /> SOLENOID VALVE , <,i THEY OCCUR. COTG CLEAN OUT TO GRADE RCVR RECEIVER
<br /> RETURN DUCT TURNING DOWN. ORDER 40. REFER TO ARCHITECTURAL SPECIFICATION FOR APPROVED FIRESTOPPING SYSTEM.
<br /> I� SHOWN.RECTANGULARBROUND)D) CP CONDENSATE PUMP RF RETURN FAN
<br /> t'
<br /> 41. ALL PIPING NOTED TO BE CAPPED FOR FUTURE EXTENSION SHALL BE PROVIDED WITH VALVE NEAR CAP TO PERMIT CR CEILING REGISTER RH RELATIVE HUMIDITY
<br /> FUTURE CONNECTION OF THE SYSTEM WITHOUT SHUTTING DOWN THE ACTIVE PORTION OF THE SYSTEM. CV COEFF.,VALVE FLOW RHC REHEAT COIL
<br /> EXHAUST DUCT TURNING UP.(IN ORDER SHOWN.
<br /> rTl-7�, RECTANGULAR 8 ROUND) 42. INSTALL SHUT-OFF VALVES AT EACH BRANCH PIPE LINE. CWS COND.WATER SUPPLY RPM REVOLUTIONS/MINUTE
<br /> IV II(K,Cy1 43. ALL PLENUM BOXES,DUCTWORK ETC TO BE LOCATED INSIDE WALL CAVITIES OR INACCESSIBLE SPACES SHALL BE CWR COND.WATER RETURN SA SUPPLYAIR
<br /> TESTED FOR AIRTIGHT CONSTRUCTION BEFORE INSTALLATION OF WALL FINISHES. CT COOLING TOWER SAD SUPPLYAIR DUCT
<br /> STR�t -
<br /> � 4-' EXHAUST DUCT TURNING DOWN.(IN ORDER 44. SUBMIT 114"SCALE SHOP DWGS,COORDINATED WITH OTHER TRADES FOR REVIEW PRIOR TO COMMENCEMENT OF D DROP OR INDIRECT DRAIN SEC SECOND
<br /> A 1 SHOWN.RECTANGULAR&ROUND) WORK. DB DRY BULB SF SUPPLY FAN
<br /> IY
<br /> 11
<br /> 45. COORDINATE SYSTEM SHUTDOWN WITH OWNER'S REPRESENTATIVE.PROVIDE A MINIMUM OF 72 HOUR NOTICE. DDC DIRECT DIGITAL CONTROL SIP STATIC PRESSURE
<br /> 46. ALL PIPING TO BE LOCATED INSIDE WALL CAVITIES OR INACCESSIBLE SPACES SHALL BE LEAK TESTED AND DEG.F DEGREES FAHRENHEIT SPEC SPECIFICATION
<br /> DUCT ACCESS DOOR INSULATED WITH VAPOR BARRIER SEAL BEFORE INSTALLATION.
<br /> DENS DENSITY SO SQUARE
<br /> �p DUCT PITOT. 47. MAX LENGTH OF FLEXIBLE DUCTWORK TO BE V. DIA DIAMETER SS STAINLESS STEEL
<br /> 7 ON DOWN STD STANDARD
<br /> ®FOR PITOT OF EXHUAST DUCT.
<br /> DRN DRAIN STM STEAM
<br /> P SP IS FOR SUPPLY DUCT.
<br /> DWG DRAWING SYM SYMBOL
<br /> ® DISPLAY MONITORAND ALARM (E) EXISTING SYS SYSTEM
<br /> AUDIO VISUAL ALARM EA EXHAUST AIR AT TEMPERATURE DIFF.
<br /> EAD EXHAUST AIR DUCT OR DAMPER
<br /> �CAV/VAV CAVIVAV BOX KIP Project No: CAP022248
<br /> HOK Project No: 20.05003.00
<br /> Sheet Title:
<br /> MECHANICAL COVER
<br /> SHEET
<br /> -ginel is 30 x 42 D. [s&this drawing.
<br /> Sheet Number
<br /> B1 M001
<br />
|