SCOPE RESPONSIBILITY MATRIX MINIMUM DUCT INSULATION REQUIREMENTS HVAC GENERAL NOTES engi stems
<br /> neered
<br /> (MC=MEOHANIGIL CONTRACTOR EC=ELEGTRIGAL CONTRACTOR PC PLUMBING CONTRACTOR CG=CONTROLS CONTRACTOR GC=GENERAL CONTRACTOR FAC=FIRE ALARM CONTRACTOR (PER 2018 WSEC/SEC REQUIREMENTS SECTION C403.10.1) sy
<br /> MIN. RECOMMENDED WAS H I N GTO N
<br /> SYSTEM DUCT LOCATION DUCT USE R-VALUE INSTALLED INS, 1. EXCEPT AS MODIFIED BY A WRITTEN CONTRACT SIGNED BY THE DESIGN-BUILDER,THE DRAWINGS,SPECIFICATIONS,AND
<br /> FURNISHED INSTALLED POWER CONTROLS THICKNESS OTHER DOCUMENTS,INCLUDING THOSE IN ELECTRONIC FORM PREPARED BY OR FOR AND/OR FURNISHED BY DESIGN-BUILDER
<br /> COORDINATION ITEM IN SCOPE NOTES 5300 DENVER AVENUE SOUTH
<br /> BY BY WIRING BY WIRING*BY UPSTREAM OF MD ARE"INSTRUMENTS OF SERVICE."THE DESIGN-BUILDER,DESIGN-BUILDER'S CONSULTANTS AND OTHER PROVIDERS OF
<br /> OSA CONDITIONED SPACE 22,800 CFM R-16 -- PROFESSIONAL SERVICES INDIVIDUALLY SHALL RETAIN A FULLY PREPAID,UNRESTRICTED, AND
<br /> LICENSE IN THE SEATTLE,WASHINGTON 98108
<br /> INSTRUMENTS OF SERVICE AS WELL AS ALL COMMON LAW,STATUTORY AND OTHER RESERVED RIGHTS,INCLUDING (206)787_8rj00
<br /> OSA CONDITIONED SPACE DOWNSTREAM OF MD R 8 COPYRIGHT IN THOSE INSTRUMENTS OF SERVICE FURNISHED BY THEM.
<br /> LOW VOLTAGE THERMOSTATS YES MC M z 2,800 CFM
<br /> C N/A MC - THE INSTRUMENTS OF SERVICE FURNISHED BY DESIGN-BUILDER ARE FOR SOLE USE BY DESIGN-BUILDER IN CONSTRUCTING THE PLANS AND SPECIFICATIONS HEREIN
<br /> OSA CONDITIONED SPACE <2,800 CFM R-7 2"LINER,OR THE SUBJECT PROJECT.THE INSTRUMENTS OF SERVICE ARE NOT SUITABLE FOR BIDDING OR CONSTRUCTING BY OTHER ARE OWNED BYAND FOR THE SOLE USE OF
<br /> LOW VOLTAGE CONTROL WIRING YES MC MC N/A MC - 3"WRAP CONTRACTORS.THEREFORE,IF DESIGN-BUILDER IS NOT RETAINED AS THE DESIGN-BUILD CONTRACTOR TO PERFORM THE
<br /> WORK DEPICTED IN THE INSTRUMENTS OF SERVICE,WITHOUT THE PRIOR WRITTEN CONSENT OF THE DESIGN BUILDER,THE ACCO ENGINEERED SYSTEMS,INC.(-ACCO-),
<br /> SA/RA OUTSIDE THE BUILDING ALL R-6 2"LINER AND MA YNOTBE REPRODUCED OR USED
<br /> INSTRUMENTS OF SERVICE MAY NOT BE REPRODUCED OR USED FOR ANY PURPOSE EXCEPT FOR GENERAL REFERENCE.
<br /> IS"LINER,OR DESIGN-BUILDER DISCLAIMS ALL LIABILITY FOR ANY ADAPTATION,MODIFICATION,OR INTERPRETATION OF THE INSTRUMENTS BY OTHERS FOR ANY PURPOSE UNLESS
<br /> SA/RA UNCONDITIONED SPACE DUCT AIR NOT WITHIN 15°F OF SPACE TEMP R-6 3•WRAP OF SERVICE,OR FOR ANY OTHER UNAUTHORIZED USE OF THESE INSTRUMENTS OF SERVICE. AUTHORIZED BYACCO IN WRITING.ACCO
<br /> SA/RA UNCONDITIONED SPACE DUCT AIR WITHIN 15°F OF SPACE TEMP R-3.3 V LINER,OR 2. THESE DOCUMENTS WERE PREPARED FOR CONSTRUCTION BY DESIGN-BUILDER ONLY.DESIGN-BUILDER DEVELOPED THESE CANNOTACCEPT ANYLIABILITY,WARRANTY,OR
<br /> 1.5"WRAP DOCUMENTS WITH ENGINEERING SOLUTIONS AND CONSTRUCTION MEANS AND METHODS UNIQUE TO DESIGN-BUILDER FOR OBLIGATION IN THE EVENT OF UNAUTHORIZED USE
<br /> SA/RA WITHIN BUILDING ENVELOPE ALL R-16 __ THE CONSTRUCTION OF THE SUBJECT PROJECT AND ARE NOT APPROPRIATE FOR OTHERS TO BID OR BUILD FROM.IN
<br /> ASSEMBLY ADDITION,THESE DRAWINGS WERE DEVELOPED FROM INFORMATION MADE KNOWN TO DESIGN-BUILDER AS OF THE DATE OF
<br /> THE DOCUMENT AND WOULD NOT INCLUDE LATER CHANGES.
<br /> SA CONDITIONED SPACE SAT<55°F OR>105°F R-3.3 V LINER,OR
<br /> 1.5 WRAP 3. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED.THE HVAC
<br /> SA CONDITIONED SPACE 55"F s SAT s 105"F NONE -- CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
<br /> 4. MAT
<br /> SERVED BY DUCT ERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2018 EDITIONS OF THE WA AREA OF WORK
<br /> CONDITIONED SPACE DIRECTLY
<br /> SA ALL NONE - MECHANICAL CODE,WA BUILDING CODE,WA FUEL AND GAS CODE,WA FIRE CODE,AND LOCAL CODES AND ORDINANCES.
<br /> SA(DOAS) CONDITIONED SPACE DOWNSTREAM OF DOAS NONE -- 5. EQUIPMENT SIZING AND SELECTION TO COMPLY WITH 2O18 WSEC 403.3.1.THE OUTPUT CAPACITY FOR HEATING AND COOLING
<br /> EQUIPMENT SHALL BE NO GREATER THAN THAT OF THE SMALLEST AVAILABLE EQUIPMENT SIZE THAT EXCEEDS THE
<br /> RA/EXH(DOAS) CONDITIONED SPACE DOWNSTREAM OF DOAS R 8 2"LINER,OR CALCULATED LOADS.
<br /> UPSTREAM OF MD 3"WRAP 6. ZONE THERMOSTATIC CONTROLS SHALL BE CONFIGURED TO PROVIDE A DEADBAND OF 5"F WITHIN WHICH THE SUPPLY OF
<br /> RELIEF I EXH CONDITIONED SPACE DOWNSTREAM OF MD R-16 --
<br /> HEATING AND COOLING ENERGY TO THE ZONE IS SHUT OFF OR REDUCED TO A MINIMUM PER 2018 WSEC C403.4.1.2. KEY PLAN N
<br /> DISCONNECT AT EQUIPMENT YES EC EC EC EC - NOTES: 7. AUTOMATIC CONTROLS SHALL BE CAPABLE OF STARTING AND STOPPING THE SYSTEM AS REQUIRED PER 2018 WSEC C403.4.2.
<br /> • DUCT SHALL BE WRAPPED OR LINED PER PLAN 8. VENTILATION AND MINIMUM OUTSIDE AIR VALUES CALCULATED PER 2018 WA MC CHAPTER 4.
<br /> • DEFAULT LINER THICKNESS=1",UNLESS OTHERWISE NOTED ON PLANS �y9A H
<br /> • DEFAULT WRAP THICKNESS=1.5",UNLESS OTHERWISE NOTED ON PLANS 9. AIRSIDE ECONOMIZER TO BE PROVIDED AS NOTED IN EQUIPMENT SCHEDULES AND MEET REQUIREMENTS OF 2018 WSEC Y41s a'�Vy
<br /> C403.5. 9G
<br /> 0 OUTSIDE AIR SUPPLY,EXHAUST OPENINGS,RETURN AIR OPENINGS USED FOR AIR SIDE ECONOMIZER OPERATION,AND
<br /> PIPING INSULATION REQUIREMENTS „
<br /> STAIRWAY AND SHAFT VENTS SHALL BE PROVIDED WITH CLASS I MOTORIZED DAMPERS PER 2018 WSEC C403.7.8. o Rg 4T10'Ep �`�
<br /> �Fs crsTes �t.
<br /> (PER 2018 WSECISEC REQUIREMENTS SECTION C403.10.3) 11. SELECTED FAN MOTORS SHALL BE NO LARGER THAN THE FIRST AVAILABLE MOTOR SIZE GREATER THAN THE DESIGN BHP PER
<br /> 2018 WSEC C403.8.2.
<br /> EXPIRES:11-28-2024
<br /> FLUID INSULATION CONDUCTIVITY NOMINAL PIPE SIZE(IN.)
<br /> OPERATING 12. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH SECTION 603 OF THE 2018 WA MC AND WITH CURRENT SMACNA
<br /> TEMP RANGE(°F) iO.25
<br /> M
<br /> MEAN RATING STANDARDS.EARTHQUAKE BRACE ALL DUCTS 28"DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12"BELOW
<br /> TEMP,"F <1 1 TO<1 21 1 21 TO<4 4 TO<8 >8 STRUCTURALSYSTEM.
<br /> 350 250 4.5 5.0 5.0 5.0 5.0 13. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT
<br /> 251-350 200 3.0 4.0 4.5 4.5 4.5 SEALANT.
<br /> 201-250 150 2.5 2.5 2.5 3.0 3.0 14. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS.
<br /> 141-200 . 125 1.5 1.5 2.0 2.0 2.0 A. DUCT WRAP,WHERE INDICATED,SHALL BE 1.5"0.75 LB/FP FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED
<br /> REINFORCED ALUMINUM FOIL VAPOR BARRIER,UNLESS NOTED OTHERWISE
<br /> 105-140 0.21-0.28 100 1.0 1.0 1.5 1.5 1.5 B. SOUND LINING,WHERE INDICATED,SHALL BE 1.0"1.5 LB/FT'FIBERGLASS DUCT LINING COATED TO PREVENT FIBER
<br /> EROSION AT VELOCITIES UP TO 4,000 FPM,UNLESS NOTED OTHERWISE.
<br /> 40-60 0.21-0.27 75 0.5 0.5 1 1.0 1.0 1.0
<br /> <40 0.20-0.26 175 0.5 1.0 1 1.0 1.0 1.5 15. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER,1.5"FIBERGLASS INSULATION,AND NON-PERFORATED
<br /> INTERIOR LINER WITH WIRE HELIX.DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT.FLEX DUCTS SHALL ONLY BE USED
<br /> NOTES: WHERE SHOWN AND SHALL NOT EXCEED 12'IN LENGTH UNLESS NOTED OTHERWISE.
<br /> 1.FOR PIPING SMALLER THAN 11/2"AND LOCATED IN PARTITIONS WITHIN CONDITIONED SPACES,REDUCTION OF THESE THICKNESSES BY 1-SHALL BE PERMITTED BUT NOT TO
<br /> ATHICKNESS LESS THAN 1". 16, PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2018 WA BC.
<br /> 2.INSULATION IS NOT REWIRED FOR CONDENSATE DRAIN PIPING FROM A DX COOLING COIL PER WSEC/SEC 403.10.3 EXCEPTION 3.IT IS RECOMMENDED THAT IF THE DRAIN
<br /> PIPING IS LOCATED WITHIN A PLENUM THAT IS NOT USED ASA RETURN AIR PATH,OR OTHER UNCONDITIONED SPACE WITH LIMITED AIRFLOW,THE DRAIN PIPE SHOULD BE INSULATED WITH 0.5-THICK INSULATION TO PREVENT CONDENSATION ON THE OUTSIDE OF THE PIPE. 17 PROVIDE FIRE DAMPERS,SMOKE DAMPERS,COMBINATION FIRE/SMOKE DAMPERS,AND CEILING RADIATION DAMPERS WHERE
<br /> INDICATED ON PLANS AND AS REQUIRED BY SECTION 607 OF THE 2015 WA MC.INSTALL IN ACCORDANCE WITH THE
<br /> MANUFACTURERS'INSTRUCTIONS,THE TERMS OF THEIR LISTING,AND THE REQUIREMENTS OF THE CODE.
<br /> C406 EFFICIENCY PACKAGE CREDITS 18. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO
<br /> AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
<br /> (PER 2018 WSEC/SEC REQUIREMENTS)
<br /> 19. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL HEATING,COOLING,OR VENTILATION EQUIPMENT
<br /> CODE SECTION OCCUPANCY CREDITS RESPONSIBILITY' DELIVERING IN EXCESS OF 2,000 CFM IN ACCORDANCE WITH SECTION 606 OF THE 2015 WA MC.
<br /> 20. HVAC EQUIPMENT,VALVES,AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS.
<br /> THIS PROJECT IS NOT REQUIRED TO COMPLY WITH C406 -- 21. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE,RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE
<br /> PROVIDED TO THE BUILDING OWNER.RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE
<br /> DATA ON EACH PIECE OF EQUIPMENT,GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM INCLUDING SIZES,
<br /> AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES.
<br /> TOTAL PROJECT CREDITS: 0 22. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE:SUBMITTAL DATA,
<br /> NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY,HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION
<br /> NOTES: INFORMATION,AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM.
<br /> 1. ACCO WILL COMPLY WITH CREDITS AS NOTED IN"RESPONSIBILITY-ACCO". 23. A WRITTEN BALANCE REPORT SHALL BE FILED WITH THE OWNER.
<br /> CREDITS NOTED AS"RESPONSIBILITY-OTHER'ARE NOT WITHIN ACCO'S SCOPE,AND ARE THE RESPONSIBILITY OF OTHER 24. COMMISSIONING:COMMISSIONING FOR THE PROJECT SHALL MEET THE REQUIREMENTS OF THE 2018 WSEC,SECTION C408. 1 12/13/2023 ISSUE FOR REVIEW TD
<br /> DISCIPLINES.THESE ARE SHOWN FOR REFERENCE ONLY. SYSTEM SHALL BE TESTED TO ENSURE CONTROL DEVICES,EQUIPMENT,AND SYSTEMS ARE CALIBRATED,ADJUSTED,AND No. Date Description By
<br /> OPERATE IN ACCORDANCE WITH THE PLANS.SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY RBVISIODS
<br /> CONTROLS WIRING INCLUDES LOW VOLTAGE WIRING AND/OR PNEUMATIC TUBING OPERATE IN ACCORDANCE WITH THE PLANS.A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE
<br /> PREPARED AND FILED WITH THE OWNER.
<br /> DUCT CONSTRUCTION SCHEDULE 25. FOR ALL"SEALED AIRTIGHT"SHAFTS,THE FOLLOWING MUST OCCUR: Project
<br /> (PRESSURE CLASS PER SMACNA TABLE 1-1S) A. ALL VERTICAL JOINTS INSIDE THE SHAFT SHOULD BE PROVIDED WITH A CONTINUOUS SEAL FOR THE LENGTH OF THE
<br /> JOINT,INCLUDING THE SHAFT CORNERS(BY G.C.) EVERETT RTU
<br /> DUCT B. TOP AND BOTTOM WALL TRACKS SHOULD BE CAULKED ALONG THEIR ENTIRE LENGTH(BY G.C.) UNIT REPLACEMENT
<br /> DUCT SECTION/COMPONENT PRESSURE CLASS C. ANY FLOOR DECKING PERPENDICULAR TO THE SHAFT SHOULD BE CAULKED.FILLING WITH ROCK WOOL IS NOT
<br /> ACCEPTABLE(BY G.C.)
<br /> D. ANY PENETRATIONS OF THE SHAFT CONSTRUCTION(DUCT WORK,CONDUIT,PIPING,...)SHOULD BE SEALED ON BOTH
<br /> LOW SIDE SUPPLY +2" SIDES OF THE PENETRATION
<br /> E. USE SECTION 909 OF THE 2018 IBC FOR MAXIMUM ALLOWABLE LEAKAGE AREA,FOLLOWING THE GUIDELINES FOR TIGHT 2525 CASINO RD
<br /> SHAFT CONSTRUCTION
<br /> LOW SIDE RETURN -z° EVERETT,WA.98204
<br /> LOAD CRITERIA
<br /> HEATING AND COOLING LOAD CALCULATIONS PERFORMED PER 2018 WSEC/SEC 403.2.1 Title
<br /> ENVELOPE VALUES DESIGN TEMPERATURES CONSTRUCTION
<br /> U-VALUE(BTUH/FT'°F) °F REQUIREMENTS
<br /> ROOF INDOOR-COOLING 75
<br /> City of Everett Permit Review WALL INDOOR-HEATING 70
<br /> EVERETT Status:Reviewed for Permit FLOOR OUTDOOR-COOLING 81
<br /> 01/18/2024 12:11:59 PM GLASS OUTDOOR-HEATING 21 T.DALGLEISH T.TOUTONGHI
<br /> GLASS(SC) SC= Designed By Checked By
<br /> INTERNAL LOADS T.DALGLEISH T.MATSUSHIMA
<br /> SPACE TYPE MISC EQUIPMENT PEOPLE DENSITY(SEAT COUNT) LIGHTING(W/SQFT) Drawn By Project Manager
<br /> OFFICE X WNVORKSTATION(OPEN);2.0 W/SOFT 2873742 1/8"=1 I-01I
<br /> CONFERENCE 2.0 W/SQFT Job Number Scale
<br /> KITCHEN 800 W O.01
<br /> SERVER ROOM 2000 W