My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4065-25
>
Ordinances
>
Ordinance 4065-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 9:08:39 AM
Creation date
1/9/2025 9:08:13 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4065-25
Date
1/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />3. Irrigation Water Rates and Charges <br /> <br />Irrigation Monthly Water Rates and <br />Charges 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />1/2-3/4" Meter Size <br />Base Water Charge $37.31 $39.17 $40.74 $42.37 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 6 CCF <br />In accordance with rate table below <br />Base Filtration Charge $6.07 $6.56 $6.76 $6.96 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 6 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />1" Meter Size <br />Base Water Charge $62.19 $65.29 $67.90 $70.62 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 10 CCF <br />In accordance with rate table below <br />Base Filtration Charge $10.12 $10.93 $11.26 $11.60 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 10 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />2" Meter Size <br />Base Water Charge $74.63 $78.35 $81.48 $84.74 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 12 CCF <br />In accordance with rate table below <br />Base Filtration Charge $12.14 $13.12 $13.51 $13.94 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 12 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />Over 2” Meter Size <br />Base Water Charge $99.50 $104.46 $108.64 $112.99 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water Consumption in <br />Excess of 16 CCF <br />In accordance with rate table below <br />Base Filtration Charge $16.19 $17.49 $18.02 $18.56 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 16 CCF <br />$1.012 $1.093 $1.126 $1.160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.