My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4065-25
>
Ordinances
>
Ordinance 4065-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 9:08:39 AM
Creation date
1/9/2025 9:08:13 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4065-25
Date
1/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Irrigation Rate Table 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />Consumption between 6-30 CCF, per <br />CCF $6.219 $6.529 $6.790 $7.062 <br />Consumption over 31 CCF, per CCF $3.935 $4.132 $4.297 $4.469 <br /> <br /> <br />4. City-Installed Service Connection Charges <br /> <br /> <br />City Installed Service Connection <br />Charges 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />5/8 x 3/4" (each) $3,975.00 $4,234.00 $4,510.00 $4,804.00 <br />1" (each) $4,508.00 $4,802.00 $5,115.00 $5,448.00 <br />2" (each) $5,865.00 $6,247.00 $6,654.00 $7,087.00 <br />Added non-refundable application fee $150.00 $158.00 $166.00 $175.00 <br /> <br />Service connection installations larger than the two-inch size shall be charged at the actual cost of the complete <br />installation. <br /> <br />Service connection applications shall be valid only for 180 days from date of issuance unless work is in progress, <br />or a time extension is granted by the Public Works Director. Service connection charges (less the non-refundable <br />application fee) may be refunded to the applicant in the event that the service has not been installed and the <br />refund is requested within one year from the date of issuance. <br /> <br />5. Developer-Installed Connection Charges <br /> <br />Developer Installed Connection Charges 2025 2026 2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />5/8 x 3/4" (each) $649.00 $682.00 $717.00 $753.00 <br />1" (each) $758.00 $796.00 $836.00 $878.00 <br />2" (each) $1,341.00 $1,409.00 $1,480.00 $1,554.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.