My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br /> <br /> <br />FULTON STREET PEDESTRIAN BICYCLE CORRIDOR <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 D AUGUST 30, 2024 <br />Category 2: Sensitive information <br />DIVISION 2 1 <br />EARTHWORK 2 <br />STREET CLEANING ----------------------------------------------------------------------------------- 72 3 <br />DIVISION 5 4 <br />SURFACE TREATMENTS AND PAVEMENTS 5 <br />Hot Mix Asphalt ------------------------------------------------------------------------------------------ 74 6 <br />5-05 CEMENT CONCRETE PAVEMENT ------------------------------------------------------- 98 7 <br />5-05.2 Materials ---------------------------------------------------------------------------------------- 98 8 <br />5-05.3 Construction Requirements ---------------------------------------------------------------- 98 9 <br />5-05.4 Measurement ---------------------------------------------------------------------------------- 99 10 <br />5-05.5 Payment ----------------------------------------------------------------------------------------- 99 11 <br />DIVISION 7 12 <br />DRAINAGE STRUCTURES, STORM SEWERS, SANITARY 13 <br />SEWERS, WATER MAINS, AND CONDUITS 14 <br />MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS ------------------------------ 100 15 <br /> Construction Requirements---------------------------------------------------------------------- 100 16 <br /> Adjusting Manholes and Catch Basins to Grade ------------------------------------------ 100 17 <br /> Adjusting Valve Boxes to Grade ---------------------------------------------------------------- 101 18 <br />7-05.4 Measurement ------------------------------------------------------------------------------- 101 19 <br />7-05.5 Payment -------------------------------------------------------------------------------------- 101 20 <br />DIVISION 8 21 <br />MISCELLANEOUS CONSTRUCTION 22 <br />CEMENT CONCRETE SIDEWALKS ------------------------------------------------------------ 103 23 <br /> Construction Requirements---------------------------------------------------------------------- 103 24 <br />ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT TRANSPORTATION 25 <br />SYSTEMS, AND ELECTRICAL -------------------------------------------------------------- 104 26 <br /> Materials ---------------------------------------------------------------------------------------------- 104 27 <br />9-29.18 Vehicle Detector ---------------------------------------------------------------------------- 104 28 <br /> 29
The URL can be used to link to this page
Your browser does not support the video tag.