My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 1 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br /> COE INTRO OptionA.RTF 1 <br />INTRODUCTION TO THE SPECIAL PROVISIONS 2 <br /> 3 <br /> 4 <br /> 5 <br />(January 4, 2024 APWA GSP, Option A) 6 <br /> 7 <br />The work on this project shall be accomplished in accordance with the Standard Specifications 8 <br />for Road, Bridge and Municipal Construction , 2024 edition, as issued by the Washington State 9 <br />Department of Transportation (WSDOT) and the American Public Works Association (APWA), 10 <br />Washington State Chapter (hereafter “Standard Specifications”). The Standard 11 <br />Specifications, as modified or supplemented by these Special Provisions, all of which are 12 <br />made a part of the Contract Documents, shall govern all of the Work. 13 <br /> 14 <br />These Special Provisions are made up of both General Special Provisions (GSPs) from 15 <br />various sources, which may have project -specific fill-ins; and project-specific Special 16 <br />Provisions. Each ProvFision either supplements, modifies, or replaces the comparable 17 <br />Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition 18 <br />to any subsection or portion of the Standard Specifications is meant to pertain only to that 19 <br />particular portion of the section, and in no way should it be interpreted that the balance of the 20 <br />section does not apply. 21 <br /> 22 <br />The GSPs are labeled under the headers of each GSP, with the effective date of the GSP and 23 <br />its source. For example: 24 <br /> 25 <br /> (March 8, 2013 APWA GSP) 26 <br /> (April 1, 2013 WSDOTGSP) 27 <br /> (May 1, 2013 City of Everett COE GSP)Agency Special Provision 28 <br /> 29 <br /> 30 <br />Project specific special provisions are labeled without a date as such: 31 <br /> (*****) 32 <br /> 33 <br />Also incorporated into the Contract Documents by reference are: 34 <br />• Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted 35 <br />edition, with Washington State modifications, if any 36 <br />• Standard Plans for Road, Bridge and Municipal Construction , WSDOT Manual 37 <br />M21-01, current edition 38 <br />• Design and Construction Standards & Specifications for Development, City of Everett, 39 <br />current edition 40 <br /> 41 <br />Contractor shall obtain copies of these publications, at Contractor’s own expense. 42 <br /> 43 <br />DIVISION1.GR1 44 <br />Division 1 45 <br />General Requirements 46 <br /> 47 <br />DESWORK.GR1 48 <br />DESCRIPTION OF WORK 49 <br /> 50
The URL can be used to link to this page
Your browser does not support the video tag.