My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 3 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br /> 1 <br />All references to the terms “State” or “state” shall be revised to read “Contracting 2 <br />Agency” unless the reference is to an administrative agency of the State of Washington, 3 <br />a State statute or regulation, or the context reasonably indicates otherwise. 4 <br /> 5 <br />All references to “State Materials Laboratory” shall be revised to read “Contracting 6 <br />Agency designated location”. 7 <br /> 8 <br />All references to “final contract voucher certification” shall be interpreted to mean the 9 <br />Contracting Agency form(s) by which final payment is authorized, and final completion 10 <br />and acceptance granted. 11 <br /> 12 <br />Additive 13 <br />A supplemental unit of work or group of bid items, identified separately in the Bid 14 <br />Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition 15 <br />to the base bid. 16 <br /> 17 <br />Alternate 18 <br />One of two or more units of work or groups of bid items, identified separately in the Bid 19 <br />Proposal, from which the Contracting Agency may make a choice between different 20 <br />methods or material of construction for performing the same work. 21 <br /> 22 <br />Business Day 23 <br />A business day is any day from Monday through Friday except holidays as listed in 24 <br />Section 1-08.5. 25 <br /> 26 <br />Contract Bond 27 <br />The definition in the Standard Specifications for “Contract Bond” applies to whatever 28 <br />bond form(s) are required by the Contract Documents, which may be a combination of a 29 <br />Payment Bond and a Performance Bond. 30 <br /> 31 <br />Contract Documents 32 <br />See definition for “Contract”. 33 <br /> 34 <br />Contract Time 35 <br />The period of time established by the terms and conditions of the Contract within which 36 <br />the Work must be physically completed. 37 <br /> 38 <br />Notice of Award 39 <br />The written notice from the Contracting Agency to the successful Bidder signifying the 40 <br />Contracting Agency’s acceptance of the Bid Proposal. 41 <br /> 42 <br />Notice to Proceed 43 <br />The written notice from the Contracting Agency or Engineer to the Contractor authorizing 44 <br />and directing the Contractor to proceed with the Work and establishing the date on which 45 <br />the Contract time begins. 46 <br /> 47 <br />Traffic 48 <br />Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and 49 <br />equestrian traffic. 50 <br /> 51
The URL can be used to link to this page
Your browser does not support the video tag.