My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 4 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-02.1.RTF 1 <br />1-02 BID PROCEDURES AND CONDITIONS 2 <br /> 3 <br />1-02.1 Prequalification of Bidders 4 <br /> 5 <br />Delete this section and replace it with the following: 6 <br /> 7 <br />1-02.1 Qualifications of Bidder 8 <br />(January 24, 2011 APWA GSP) 9 <br /> 10 <br />Before award of a public works contract, a bidder must meet at least the minimum 11 <br />qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to 12 <br />be awarded a public works project. 13 <br /> 14 <br />COE 1-02.2.RTF 15 <br />1-02.2 Plans and Specifications 16 <br />(June 27, 2011 APWA GSP) 17 <br /> 18 <br />Delete this section and replace it with the following: 19 <br /> 20 <br />Information as to where Bid Documents can be obtained or reviewed can be found in the 21 <br />Call for Bids (Advertisement for Bids) for the work. 22 <br /> 23 <br />After award of the contract, plans and specifications will be issued to the Contractor at no 24 <br />cost as detailed below: 25 <br /> 26 <br />To Prime Contractor No. of Sets Basis of Distribution <br />Reduced plans (11" x 17") 5 Furnished automatically <br />upon award. <br />Contract Provisions <br /> 5 Furnished automatically <br />upon award. <br />Large plans (e.g., 22" x <br />34") 3 Furnished only upon <br />request. <br /> 27 <br />Additional plans and Contract Provisions may be obtained by the Contractor from the 28 <br />source stated in the Call for Bids, at the Contractor’s own expense. 29 <br /> 30 <br />F1-02.4(1).OptionB.docx 31 <br />1-02.4(1) General 32 <br />(December 30, 2022 APWA GSP Option B) 33 <br /> 34 <br />The first sentence of the ninth paragraph, beginning with “Prospective Bidder desiring…”, 35 <br />is revised to read: 36 <br /> 37 <br />Prospective Bidders desiring an explanation or interpretation of the Bid Documents, 38 <br />shall request the explanation or interpretation in writing by close of business ***3*** 39 <br />business days preceding the bid opening to allow a written reply to reach all 40 <br />prospective Bidders before the submission of their Bids. 41
The URL can be used to link to this page
Your browser does not support the video tag.