My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 8 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />solicitation on the first work day on which the normal work processes of the 1 <br />Contracting Agency resume. 2 <br /> 3 <br />Supplemental bid information submitted after the proposal submittal but within 48 4 <br />hours of the time and date the proposal is due, shall be submitted as follows: 5 <br /> 6 <br />1. In a sealed envelope labeled the same as for the Proposal, with “Supplemental 7 <br />Information” added, or 8 <br />2. By facsimile to the following FAX number: 425 257-8882, or 9 <br />3. By e-mail to the following e-mail address: sbridge@everettwa.gov 10 <br /> 11 <br />DBE Utilization Certification (WSDOT Form 272 -056) 12 <br />The DBE Utilization Certification shall be received at the same location and no later than 13 <br />the time required for delivery of the Proposal. The Contracting Agency will not open or 14 <br />consider any Proposal when the DBE Utilization Certification is received after the time 15 <br />specified for receipt of Proposals or received in a location other than that specified for 16 <br />receipt of Proposals. The DBE Utilization Certification may be submitted in the same 17 <br />envelope as the Bid deposit. 18 <br /> 19 <br />DBE Written Confirmation Document (WSDOT Form 422-031) and/or GFE 20 <br />Documentation, (if applicable) 21 <br />The DBE Written Confirmation Documents and/or GFE Documentation are not required to 22 <br />be submitted with the Proposal. The DBE Written Confirmation Document(s) and/or GFE 23 <br />Documentation(if applicable) shall be received either with the Bid Proposal or as a 24 <br />Supplement to the Bid. The Written Confirmation and/or GFE Documentation shall be 25 <br />received no later than 48 hours (not including Saturdays, Sundays and Holidays) after the 26 <br />time for delivery of the Proposal. To be considered responsive, Bidders shall submit a 27 <br />Written Confirmation Document from each DBE firm listed on the Bidder’s completed DBE 28 <br />Utilization Certification and/or the GFE Documentation as required by Section 1 -02.6. 29 <br /> 30 <br />DBE Bid Item Breakdown Form (WSDOT Form 272-054) 31 <br />The DBE Bid Item Breakdown shall be received either with the Bid Proposal or as a 32 <br />Supplement to the Bid. The documents shall be received no later than 48 hours (not 33 <br />including Saturdays, Sundays and Holidays) after the time for delivery of the Proposal. To 34 <br />be considered responsive, Bidders shall submit a completed DBE Bid Item Breakdown, 35 <br />however, the Contractor may correct minor errors to the DBE Bid Item Breakdown for a 36 <br />period up to five calendar days after bid opening (not including Saturdays, Sundays and 37 <br />Holidays). DBE Bid Item Breakdowns that are still incorrect after the correction period will 38 <br />be determined to be non-responsive. 39 <br /> 40 <br />The DBE Bid Item Breakdown will not be included as part of the executed Contract. 41 <br />1-02.13.RTF 42 <br />1-02.13 Irregular Proposals 43 <br />(January 4, 2024 APWA GSP) 44 <br /> 45 <br />Delete this section and replace it with the following: 46 <br /> 47 <br />1. A Proposal will be considered irregular and will be rejected if: 48 <br />a. The Bidder is not prequalified when so required; 49 <br />b. The Bidder adds provisions reserving the right to reject or accept the Award, 50 <br />or enter into the Contract; 51 <br />c. A price per unit cannot be determined from the Bid Proposal; 52
The URL can be used to link to this page
Your browser does not support the video tag.