Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 7 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1. Contracting Agency-assigned number for the project; 1 <br />2. Name of the project; 2 <br />3. The Contracting Agency named as obligee; 3 <br />4. The amount of the bid bond stated either as a dollar figure or as a percentage which 4 <br />represents five percent of the maximum bid amount that could be awarded; 5 <br />5. Signature of the bidder’s officer empowered to sign official statements. The signature 6 <br />of the person authorized to submit the bid should agree with the signature on the 7 <br />bond, and the title of the person must accompany the said signature; 8 <br />6. The signature of the surety’s officer empowered to sign the bond and the power of 9 <br />attorney. 10 <br /> 11 <br />If so stated in the Contract Provisions, bidder must use the bond form included in the 12 <br />Contract Provisions. 13 <br /> 14 <br />If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. 15 <br /> 16 <br />1-02.9.OptionB.RTF 17 <br />1-02.9 Delivery of Proposal 18 <br />( July 8, 2024 APWA GSP Option B) 19 <br /> 20 <br />Delete this section and replace it with the following: 21 <br /> 22 <br />DBE DOCUMENT SUBMITTAL REQUIREMENTS 23 <br />General 24 <br />Each Proposal shall be submitted in a sealed envelope, with the Project Name and 25 <br />Project Number as stated in the Call for Bids clearly marked on the outside of the 26 <br />envelope, or as otherwise required in the Bid Documents, to ensure proper handling 27 <br />and delivery. 28 <br /> 29 <br />To be considered responsive on a FHWA -funded project, the Bidder may be required 30 <br />to submit the following items, as required by Section 1 -02.6: 31 <br /> 32 <br />• DBE Utilization Certification (WSDOT 272 -056) 33 <br />• DBE Written Confirmation Document (WSDOT 422 -031) from each DBE firm 34 <br />listed on the Bidder’s completed DBE Utilization Certification 35 <br />• Good Faith Effort (GFE) Documentation (if applicable) 36 <br />• DBE Bid Item Breakdown (WSDOT 272-054) 37 <br /> 38 <br />Proposals that are received as required will be publicly opened and read as specified 39 <br />in Section 1-02.12. The Contracting Agency will not open or consider any Bid 40 <br />Proposal that is received after the time specified in the Call for Bids for receipt of Bid 41 <br />Proposals or received in a location other than that specified in the Call for Bids. The 42 <br />Contracting Agency will not open or consider any “Supplemental Information” (Written 43 <br />Confirmation Documents or GFE Documentation) that is received after the time 44 <br />specified or received in a location other than that specified in the Call for Bids. 45 <br /> 46 <br />If an emergency or unanticipated event interrupts normal work processes of the 47 <br />Contracting Agency so that Proposals cannot be received at the office designated for 48 <br />receipt of bids as specified in Section 1 -02.12 the time specified for receipt of the 49 <br />Proposal will be deemed to be extended to the same time of day specified in the 50