My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 14 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-05.7.RTF 1 <br />1-05.7 Removal of Defective and Unauthorized Work 2 <br />(October 1, 2005 APWA GSP) 3 <br /> 4 <br />Supplement this section with the following: 5 <br /> 6 <br />If the Contractor fails to remedy defective or unauthorized work within the time specified 7 <br />in a written notice from the Engineer, or fails to perform any part of the work required by 8 <br />the Contract Documents, the Engineer may correct and remedy such work as may be 9 <br />identified in the written notice, with Contracting Agency forces or by such other means as 10 <br />the Contracting Agency may deem necessary. 11 <br /> 12 <br />If the Contractor fails to comply with a written order to remedy what the Engineer 13 <br />determines to be an emergency situation, the Engineer may have the defective and 14 <br />unauthorized work corrected immediately, have the rejected work removed and replaced, 15 <br />or have work the Contractor refuses to perform completed by using Contracting Agency 16 <br />or other forces. An emergency situation is any situation when, in the opinion of the 17 <br />Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk 18 <br />of loss or damage to the public. 19 <br /> 20 <br />Direct or indirect costs incurred by the Contracting Agency attributable to correcting and 21 <br />remedying defective or unauthorized work, or work the Contractor failed or refused to 22 <br />perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from 23 <br />monies due, or to become due, the Contractor. Such direct and indirect costs shall 24 <br />include in particular, but without limitation, compensation for additional professional 25 <br />services required, and costs for repair and replacement of work of others destroyed or 26 <br />damaged by correction, removal, or replacement of the Contractor’s unauthorized work. 27 <br /> 28 <br />No adjustment in contract time or compensation will be allowed because of the delay in 29 <br />the performance of the work attributable to the exercise of the Contracting Agency’s 30 <br />rights provided by this Section. 31 <br /> 32 <br />The rights exercised under the provisions of this section shall not diminish the 33 <br />Contracting Agency’s right to pursue any other avenue for additional remedy or damages 34 <br />with respect to the Contractor’s failure to perform the work as required. 35 <br /> 36 <br /> 37 <br />1-05.11.RTF 38 <br />1-05.11 Final Inspection 39 <br /> 40 <br />Delete this section and replace it with the following: 41 <br /> 42 <br />1-05.11 Final Inspections and Operational Testing 43 <br />(October 1, 2005 APWA GSP) 44 <br /> 45 <br />1-05.11(1) Substantial Completion Date 46 <br /> 47 <br />When the Contractor considers the work to be substantially complete, the Contractor 48 <br />shall so notify the Engineer and request the Engineer establish the Substantial 49 <br />Completion Date. The Contractor’s request shall list the specific items of work that 50 <br />remain to be completed in order to reach physical completion. The Engineer will 51 <br />schedule an inspection of the work with the Contractor to determine the status of 52
The URL can be used to link to this page
Your browser does not support the video tag.