<br />Fulton Street Pedestrian Bicycle Corridor PAGE 16 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />systems; irrigation systems; buildings; or other similar work it may be desirable for the 1 <br />Engineer to have the Contractor operate and test the work for a period of time after final 2 <br />inspection but prior to the physical completion date. Whenever items of work are listed in 3 <br />the Contract Provisions for operational testing they shall be fully tested under operating 4 <br />conditions for the time period specified to ensure their acceptability prior to the Physical 5 <br />Completion Date. During and following the test period, the Contractor shall correct any 6 <br />items of workmanship, materials, or equipment which prove faulty, or that are not in first 7 <br />class operating condition. Equipment, electrical controls, meters, or other devices and 8 <br />equipment to be tested during this period shall be tested under the observation of the 9 <br />Engineer, so that the Engineer may determine their suitability for the purpose for which 10 <br />they were installed. The Physical Completion Date cannot be established until testing 11 <br />and corrections have been completed to the satisfaction of the Engineer. 12 <br /> 13 <br />The costs for power, gas, labor, material, supplies, and everything else needed to 14 <br />successfully complete operational testing, shall be included in the unit contract prices 15 <br />related to the system being tested, unless specifically set forth otherwise in the proposal. 16 <br /> 17 <br />Operational and test periods, when required by the Engineer, shall not affect a 18 <br />manufacturer’s guaranties or warranties furnished under the terms of the contract. 19 <br /> 20 <br /> 21 <br />1-05.13.RTF 22 <br />1-05.13 Superintendents, Labor and Equipment of Contractor 23 <br />(August 14, 2013 APWA GSP) 24 <br /> 25 <br />Delete the sixth and seventh paragraphs of this section. 26 <br /> 27 <br />1-05.14.GR1 28 <br />Cooperation with Other Contractors 29 <br /> 30 <br />1-05.14.INST1.GR1 31 <br />Section 1-05.14 is supplemented with the following: 32 <br /> 33 <br />F1-05.14.OPT1.DOCX 34 <br />(March 13, 1995) 35 <br />Other Contracts Or Other Work 36 <br />It is anticipated that the following work adjacent to or within the limits of this project will 37 <br />be performed by others during the course of this project and will require coordination of 38 <br />the work: 39 <br /> 40 <br />*** 41 <br /> 42 <br />• 2024 Pavement Maintenance Overlay project is adjacent to the Work on Pacific Ave 43 <br />at Fulton Ave. 44 <br /> 45 <br /> 46 <br />*** 47 <br /> 48 <br />1-05.15.RTF 49 <br />1-05.15 Method of Serving Notices 50 <br />(January 4, 2024 APWA GSP) 51 <br /> 52