Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 25 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />1-07.5.OPT1.GR1 1 <br />(September 20, 2010) 2 <br />Environmental Commitments 3 <br />The following Provisions summarize the requirements, in addition to those required 4 <br />elsewhere in the Contract, imposed upon the Contracting Agency by the various 5 <br />documents referenced in the Special Provision Permits and Licenses. Throughout the 6 <br />work, the Contractor shall comply with the following requirements: 7 <br /> 8 <br />1-07.5.OPT2.GR1 9 <br />(August 3, 2009) 10 <br />Payment 11 <br />All costs to comply with this special provision for the environmental commitments and 12 <br />requirements are incidental to the contract and are the responsibility of the Contractor. 13 <br />The Contractor shall include all related costs in the associated bid prices of the contract. 14 <br /> 15 <br /> 16 <br />1-07.7.GR1 17 <br />Load Limits 18 <br /> 19 <br />1-07.7.INST1.GR1 20 <br />Section 1-07.7 is supplemented with the following: 21 <br /> 22 <br />1-07.7.OPT6.GR1 23 <br />(March 13, 1995) 24 <br />If the sources of materials provided by the Contractor necessitates hauling over roads 25 <br />other than State Highways, the Contractor shall, at the Contractor's expense, make all 26 <br />arrangements for the use of the haul routes. 27 <br /> 28 <br />1-07.9.GR1 29 <br />Wages 30 <br /> 31 <br />1-07.9(1).GR1 32 <br />General 33 <br /> 34 <br />1-07.9(1).INST1.GR1 35 <br />Section 1-07.9(1) is supplemented with the following: 36 <br /> 37 <br />1-07.9(1).OPT1.GR1 38 <br />(January 10, 2024) 39 <br />The Federal wage rates incorporated in this contract have been established by the 40 <br />Secretary of Labor under United States Department of Labor General Decision No. 41 <br />WA20240001. 42 <br /> 43 <br />The State rates incorporated in this contract are applicable to all construction 44 <br />activities associated with this contract. 45 <br /> 46 <br />1-07.9(5)A.RTF 47 <br />1-07.9(5)A Required Documents 48 <br />(July 8, 2024 APWA GSP) 49 <br /> 50 <br />This section is revised to read as follows: 51 <br /> 52