My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthwork Solutions, LLC 1/15/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthwork Solutions, LLC 1/15/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 1:51:12 PM
Creation date
1/15/2025 1:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthwork Solutions, LLC
Approval Date
1/15/2025
Council Approval Date
9/11/2024
Department
Public Works
Department Project Manager
Laura Claywell
Subject / Project Title
FULTON STREET PEDESTRIAN BICYCLE CORRIDOR
Tracking Number
0004652
Total Compensation
$663,840.07
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 26 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />All Statements of Intent to Pay Prevailing Wages, Affidavits of Wages Paid and Certified 1 <br />Payrolls, including a signed Statement of Compliance for Federal -aid projects, shall be 2 <br />submitted to the Engineer and to the State L&I online Prevailing Wage Intent & Affidavit 3 <br />(PWIA) system. When apprenticeship is a requirement of the contract, include in PWIA all 4 <br />apprentices. 5 <br /> 6 <br />1-07.11.GR1 7 <br />Requirements for Nondiscrimination 8 <br /> 9 <br />1-07.11.INST1.GR1 10 <br />Section 1-07.11 is supplemented with the following: 11 <br /> 12 <br />1-07.11.OPT1.GR1 13 <br />(October 3, 2022) 14 <br />Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive 15 <br />Order 11246) 16 <br /> 17 <br />1. The Contractor's attention is called to the Equal Opportunity Clause and the Standard 18 <br />Federal Equal Employment Opportunity Construction Contract Specifications set 19 <br />forth herein. 20 <br /> 21 <br />2. The goals and timetables for minority and female participation set by the Office of 22 <br />Federal Contract Compliance Programs, expressed in percentage terms for the 23 <br />Contractor's aggregate work force in each construction craft and in each trade on all 24 <br />construction work in the covered area, are as follows: 25 <br /> 26 <br />Women - Statewide 27 <br /> 28 <br />Timetable Goal 29 <br /> 30 <br />Until further notice 6.9% 31 <br />Minorities - by Standard Metropolitan Statistical Area (SMSA) 32 <br /> 33 <br />Spokane, WA: 34 <br />SMSA Counties: 35 <br />Spokane, WA 2.8 36 <br />WA Spokane. 37 <br />Non-SMSA Counties 3.0 38 <br />WA Adams; WA Asotin; WA Columbia; WA Ferry; WA Garfield; WA 39 <br />Lincoln, WA Pend Oreille; WA Stevens; WA Whitman. 40 <br /> 41 <br />Richland, WA 42 <br />SMSA Counties: 43 <br />Richland Kennewick, WA 5.4 44 <br />WA Benton; WA Franklin. 45 <br />Non-SMSA Counties 3.6 46 <br />WA Walla Walla. 47 <br /> 48
The URL can be used to link to this page
Your browser does not support the video tag.