Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 45 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />Original Quantity Underruns 1 <br />In the event that Work committed to a DBE firm as part of the COA underruns 2 <br />the original planned quantities the Contractor may be required to substitute other 3 <br />remaining Work to another DBE. 4 <br /> 5 <br />Contractor Proposed DBE Substitutions 6 <br />Requests to substitute a COA DBE must be for good cause (see DBE 7 <br />termination process below), and requires prior written approval of the Engineer. 8 <br />After receiving a termination with good cause approval, the Contractor may only 9 <br />replace a DBE with another certified DBE. When any changes between 10 <br />Contract Award and Execution result in a substitution of COA DBE, the substitute 11 <br />DBE shall have been certified prior to the bid opening on the Contract. 12 <br /> 13 <br />DBE Termination 14 <br />Termination of a COA DBE (or an approved substitute DBE) is only allowed in 15 <br />whole or in part for good cause and with prior written approval of the Engineer. 16 <br />If the Contractor terminates a COA DBE without the prior written approval of the 17 <br />Engineer, the Contractor shall not be entitled to payment for work or material 18 <br />committed to, but not performed/supplied by the COA DBE. In addition, 19 <br />sanctions may apply as described elsewhere in this specification. 20 <br /> 21 <br />Prior to requesting approval to terminate a COA DBE, the Contractor shall give 22 <br />notice in writing to the DBE with a copy to the Engineer of its intent to request to 23 <br />terminate DBE Work and the reasons for doing so. The DBE shall have five (5) 24 <br />days to respond to the Contractor’s notice. The DBE’s response shall either 25 <br />support the termination or advise the Engineer and the Contractor of the reasons 26 <br />it objects to the termination of its subcontract. 27 <br /> 28 <br />If the request for termination is approved, the Contractor is required to substitute 29 <br />with another DBE to perform at least the same amount of work as the DBE that 30 <br />was terminated (or provide documentation of GFE). A plan to replace the COA 31 <br />DBE Commitment amount shall be submitted to the Engineer within 2 days of 32 <br />the approval of termination. The plan to replace the Commitment shall provide 33 <br />the same detail as that required in the DBE Utilization Certification. 34 <br /> 35 <br />The Contractor must have good cause to terminate a COA DBE. 36 <br /> 37 <br />Good cause typically includes situations where the DBE Subcontractor is unable 38 <br />or unwilling to perform the work of its subcontract. Good cause may exist if: 39 <br /> 40 <br />• The DBE fails or refuses to execute a written contract. 41 <br /> 42 <br />• The DBE fails or refuses to perform the Work of its subcontract in a 43 <br />way consistent with normal industry standards. 44 <br /> 45 <br />• The DBE fails or refuses to meet the Contractor’s reasonable 46 <br />nondiscriminatory bond requirements. 47 <br /> 48 <br />• The DBE becomes bankrupt, insolvent, or exhibits credit unworthiness. 49 <br /> 50