Laserfiche WebLink
<br />Fulton Street Pedestrian Bicycle Corridor PAGE 46 OF 114 CONTRACT <br />FEDERAL AID # TAP-0420(026) <br />WO #3785 September 6, 2024 <br /> <br />• The DBE is ineligible to work on public works projects because of 1 <br />suspension and debarment proceedings pursuant to federal law or 2 <br />applicable State law. 3 <br /> 4 <br />• The DBE is ineligible to receive DBE credit for the type of work 5 <br />involved. 6 <br /> 7 <br />• The DBE voluntarily withdraws from the project and provides written 8 <br />notice of its withdrawal. 9 <br /> 10 <br />• The DBE’s work is deemed unsatisfactory by the Engineer and not in 11 <br />compliance with the Contract. 12 <br /> 13 <br />• The DBE’s owner dies or becomes disabled with the result that the DBE 14 <br />is unable to complete its Work on the Contract. 15 <br /> 16 <br />Good cause does not exist if: 17 <br /> 18 <br />• The Contractor seeks to terminate a COA DBE so that the Contractor 19 <br />can self-perform the Work. 20 <br /> 21 <br />• The Contractor seeks to terminate a COA DBE so the Contractor can 22 <br />substitute another DBE contractor or non -DBE contractor after 23 <br />Contract Award. 24 <br /> 25 <br />• The failure or refusal of the COA DBE to perform its Work on the 26 <br />subcontract results from the bad faith or discriminatory action of the 27 <br />Contractor (e.g., the failure of the Contractor to make timely payments 28 <br />or the unnecessary placing of obstacles in the path of the DBE’s Work). 29 <br /> 30 <br /> 31 <br /> 32 <br />Decertification 33 <br />When a DBE is “decertified” from the DBE program during the course of the 34 <br />Contract, the participation of that DBE shall continue to count as DBE 35 <br />participation as long as the subcontract with the DBE was executed prior to the 36 <br />decertification notice. The Contractor is obligated to substitute when a DBE does 37 <br />not have an executed subcontract agreement at the time of decertification. 38 <br /> 39 <br />Consequences of Non-Compliance 40 <br />Breach of Contract 41 <br />Each contract with a Contractor (and each subcontract the Contractor signs with 42 <br />a Subcontractor) must include the following assurance clause: 43 <br /> 44 <br />The Contractor, subrecipient, or Subcontractor shall not discriminate on the 45 <br />basis of race, color, national origin, or sex in the performance of this contract. 46 <br />The Contractor shall carry out applicable requirements of 49 CFR Part 26 in the 47 <br />award and administration of DOT-assisted contracts. Failure by the Contractor 48 <br />to carry out these requirements is a material breach of this Contract, which may 49 <br />result in the termination of this Contract or such other remedy as the recipient 50 <br />deems appropriate, which may include, but is not limited to: 51 <br /> 52