Laserfiche WebLink
EXHIBIT C <br /> NWS INITIAL PROJECT <br /> A. NWS Initial Project. NWS will construct the following improvements on the Ballfield <br /> Property at no cost to the City: <br /> Improvement Name Description <br /> Infield synthetic turf NWS will install synthetic turf to the infield areas of <br /> installation Kasch Park ballfields 1-4. Installation of synthetic turf <br /> to the infield will allow for expanded use of the <br /> ballfields for age groups 8u -18u—currently the <br /> fields serve players 8u-13u. <br /> Contractor shall follow surfacing manufacturer's <br /> installation and drainage specifications and <br /> recommendations, meet City of Everett stormwater <br /> standards and adhere to the State of Washington <br /> Department of Ecology (WDOE) requirements (based <br /> on current Stormwater Management Manual for <br /> Western Washington). <br /> Contractor shall meet all Site Development <br /> requirements, including stormwater, and secure all <br /> necessary permits. <br /> Add equipment such as NWS will purchase new bases for all 4 fields so that <br /> mounds, bases, etc. to the base lengths of 60, 65, 70, 80 or 90 foot can all be <br /> infield. used. NWS will utilize existing mounds onsite at Kasch <br /> Park and resurface them as needed. NWS will also <br /> purchase new mounds to be used for the older age <br /> groups. <br /> Improve spectator and player NWS will purchase and install this netting barrier. <br /> safety by installing enhanced This protective barrier made of durable and resilient <br /> backstop netting to protect net material will replace the current netting system. <br /> fans from foul balls. This enhanced netting system placed behind home <br /> plate and along the baselines will help prevent foul <br /> balls and flying bats from entering the stands and <br /> potentially injuring spectators. <br /> NWS will provide all licenses, insurance, Washington State Labor and Industries <br /> affidavits and any other documents as required by the City of Everett. <br /> All the improvements in the table above are collectively referred to as the "NWS Initial Project". <br /> Exhibit C-1 <br />