My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 2:27:40 PM
Creation date
1/22/2025 2:25:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Call for Bid – Everett Transit Mall Station Platform & Building Construction <br />Council Bill # interoffice use <br /> <br />Project: Everett Mall Station Platform <br />Partner/Supplier: PACE Engineers Inc. <br /> Location: Everett Mall, 1330 SE Everett Mall Way, Everett WA 98208 <br />Preceding action: RFQ 2024-019 PSA with PACE Engineers Inc. 3/27/2024, Amended 8/14/2024 <br />Fund: Fund 425, Transportation Services <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />Proposed action <br />Consent 1/22/25 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br /> <br /> <br />Department(s) involved: <br />Transit <br /> <br />Contact person: <br />Mike Schmieder <br /> <br />Phone number: <br />425-257-7761 <br /> <br />Email: <br />mschmieder@everettwa.gov <br />Initialed by: <br />MJS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The engineering estimate for the construction of the new Mall Station platform, customer <br />amenities, and driver facility is $1,512,032 million. The project is funded with Everett Transit fund <br />425 and offset with a $200,000 contribution from the Mall ownership group, Brixton Capital. <br />Project summary statement: <br />Everett Mall is redeveloping and expanding its footprint. To accommodate the new footprint, <br />Everett Transit has been asked to relocate its Mall Station platform and facility approximately <br />500 ft west of its current location. <br /> <br />PACE Engineers, Inc. is providing design and engineering services for the relocation of the bus <br />platform, customer amenities, and driver facility, and produced the construction bid <br />specifications and bid drawings for the project. <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Call for Bids for the construction of the new Everett Transit Mall Station at Everett <br />Mall. <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.