My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/01/22 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/01/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2025 2:27:40 PM
Creation date
1/22/2025 2:25:05 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
December 2024 Page 6 of 9 Jacobs Engineering Group Subtask 2440P – Issue for Bid Documents - Pacific Avenue Assumptions: • See Subsection 2, “Assumptions for Amendment No. 2” in front of this document. • Same drawings as at 100%. • Only limited changes, consistent with previous comments and decisions and items noted at the 100% design workshop. • BNSF Shoring Design and Permit: o The shoring design is to facilitate the SRI connection vault construction. The estimated interior shoring dimensions are 20’ x 40’. o Three rounds of submittals: 90% to City Permit submittal to BNSF Final permit submittal with BNSF comments incorporated. o Specifications will be based on the City’s APWA and WSDOT format specifications. Activities: • The Consultant will visually examine the project site to verify that site conditions have not changed since the time of initial site survey and notify/discuss any significant findings which may have an impact on proposed improvements. • The Consultant will prepare construction plans and specifications by completing final design and incorporating comments from previous design submittal. • The Consultant will submit final documents for bidding. • BNSF Shoring Design and Permit: o Review existing conditions and documents. o Prepare Geotechnical and Structural Design Recommendations for Shoring Design. o Provide shoring design to meet “BNSF UTILITY ACCOMMODATION POLICY” dated February 15, 2024. o Prepare and submit permit, draft and final including incorporation of BNSF comments. Includes coordinating with BNSF during the permitting process at the City’s direction. o Specification updates: Modify Bid Item Description (Division B). Modify Division 1 to add language requiring Contractor to take on schedule risk and permitting requirements related to any contractor initiated shoring changes that impact the BNSF permit. Update special provisions related to shoring (Section 2-09 Structure Excavation). Add Appendix for approved BNSF shoring permit. o Drawing updates: Update C114 and C124 with additional shoring requirements. Add two sheet for structural notes related to shoring. Add sheet for shoring plan. Add sheet for shoring details.
The URL can be used to link to this page
Your browser does not support the video tag.