Laserfiche WebLink
December 2024 Page 7 of 9 Jacobs Engineering Group  Add sheet for section (to include BNSF required items). o Additional construction support:  Geotechnical Engineer will need to be on site for duration of shoring construction and removal (assumed 10 days).  Shoring inspection as-needed while shoring remains installed (assume 1 day).  Review Contractor monitoring plan submittals for shoring and adjacent ground movement. Deliverables: Final Documents for bidding: 1. Review Comment Responses – electronic files (PDF). 2. Review Comment Responses – electronic files (PDF). 3. Full-size Plans – electronic files (PDF). 4. Project Manual Documents – electronic files (PDF). BNSF Shoring Design and Permit: 1. Permit package (see page 43 of BNSF policy file). 2. Geotechnical Design Memorandum for Shoring Design. 3. Monitoring plan (if required for BNSF permit submittal). 4. Calculations. Task 2500 – WSDOT Coordination The Consultant will continue to support the completion of Utility and Franchise applications and provide the City with assistance in related coordination with WSDOT, as requested. Assumptions: • The Consultant has provided an allowance of 16 hours to provide assistance to the City to close out remaining WSDOT franchise documents. Activities: • Respond to questions and provide updates to submitted documents at the City’s request. Deliverables: • As needed. Task 2700 – Estimate of Probable Construction Cost and Construction Schedule Assumptions: • City, where available, shall provide Consultant with itemized bid tabulation of similar recent construction bids for use in developing project cost estimates. • The Consultant will prepare its opinion of probable construction cost in accordance with the Association for the Advancement of Cost Engineering, International (AACEI), considering local