Laserfiche WebLink
December 2024 Page 9 of 9 Jacobs Engineering Group to be used during bidding, by completing final design and incorporating comments from previous design submittal to update the estimate. The final construction cost contingency amount will be added as directed by the City. The Consultant will prepare a Class 1 OPCC (+15%/-10%) at 100% design in accordance with the AACEI recommended practices, and a construction schedule. Deliverables: 1. 100% Final OPCC Estimate and Construction Schedule – electronic files (PDF). END OF SCOPE OF WORK FOR AMENDMENT NO. 2 CITY OF EVERETT 36th ST CSO Storage December 2024