December 2024 Page 8 of 9 Jacobs Engineering Group and climatic conditions. The Consultant will utilize available information to estimate potential inflation and escalation costs. • The Consultant will prepare an estimated construction schedule in MS Project. Construction schedule shall cover construction activities from Notice to Proceed to Final completion, and be coordinated with the City’s schedule for design completion, bidding, and contract award. The project schedule shall be developed based on the design-bid-build delivery method. The construction schedule shall include a high level, general list of construction activities for the project and provide an estimated contract duration and completion date. • However, the Consultant cannot predict future market conditions, or the effect of bidding competition, on the project bid price and schedule. Therefore, the Consultant cannot warrant that bids or ultimate construction cost and schedules will not vary from cost estimates and construction schedules prepared under this task. Activities: Prepare 100%Final Estimate of Probably Construction Cost and Construction Schedule The Consultant will prepare the final Engineer’s Estimate to be used during bidding, by completing final design and incorporating comments from previous design submittal to update the estimate. The final construction cost contingency amount will be added as directed by the City. The Consultant will prepare a Class 1 OPCC (+15%/-10%) at 100% design in accordance with the AACEI recommended practices, and a construction schedule. Deliverables: 1. 100%Final OPCC Estimate and Construction Schedule – electronic files (PDF). Task 2700P – Estimate of Probable Construction Cost and Construction Schedule – Pacific Avenue Assumptions: • City, where available, shall provide Consultant with itemized bid tabulation of similar recent construction bids for use in developing project cost estimates. • The Consultant will prepare its opinion of probable construction cost in accordance with the Association for the Advancement of Cost Engineering, International (AACEI), considering local and climatic conditions. The Consultant will utilize available information to estimate potential inflation and escalation costs. • The Consultant will prepare an estimated construction schedule. • However, the Consultant cannot predict future market conditions, or the effect of bidding competition, on the project bid price and schedule. Therefore, the Consultant cannot warrant that bids or ultimate construction cost and schedules will not vary from cost estimates and construction schedules prepared under this task. Activities: Prepare 100%Final Estimate of Probably Construction Cost and Construction Schedule The Consultant will prepare the final Engineer’s Estimate (including new work items in this amendment)