My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9914 18TH AVE W A 2025-07-30
>
Address Records
>
18TH AVE W
>
9914
>
9914 18TH AVE W A 2025-07-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 11:19:41 AM
Creation date
1/23/2025 10:10:17 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9914
Unit
A
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113TIL 19011 Wood-Sno Road NE, Suite 100 <br />Woodinville, WA 98072-4436 <br />Phone: (425) 814-8448 <br />ENGINEERING Fax: (425) 821-2120 <br />SPECIAL INSPECTION <br />Date: June 12, 2024 <br />To: Pacific Ridge Homes <br />Attn: Ezra Schrader <br />From: Aiden Bernhardt, P.E. <br />Project: Benton Square TH — Building A Pages: 2 <br />BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br />nailing at 4" on center or less for the abovementioned project. The following Special Inspection Report includes a <br />summary of our site visit. <br />Construction Documents: <br />❑ Construction Set dated 06/08/2023 <br />Progress of construction: <br />❑ Date of inspection: 05/22/2024 <br />❑ Foundation completed <br />❑ Framing completed <br />Items observed: <br />31d Floor Exterior Walls: <br />❑ Front P1-3 Exterior Shear Wall (C -Units) <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />Note: (1) instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br />were observed at time of inspection. Builder has been notified and has provided pictures of <br />the resolution. Construction conforms to plan set. <br />o Panel Seam Construction. (4) instances of P1-3 wall missing double studs at the adjoining panel <br />edges per Detail 1 /S06 were observed at time of inspection. Builder has been notified and has <br />provided pictures of the resolution. Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />2nd Floor Exterior Walls: <br />❑ Front/Rear P1-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: <br />Note: (2) instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br />were observed at time of inspection. Additionally, (2) instances of insufficient nailing were <br />observed at time of inspection. Builder has been notified and has provided pictures of the <br />resolution. Construction conforms to plan set. <br />o Panel Seam Construction: <br />Note: (2) instances of P1-2 wall missing double studs at the adjoining panel edges per Detail 1 /S06 <br />were observed at time of inspection. Builder has been notified and has provided pictures of <br />the resolution. Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans: <br />o Note: The truss and bottom plate nailing of the wall above per detail 7/S08 and 6/S08 was <br />observed to be missing along the entire building length. Builder has been notified and has <br />provided pictures of the resolution. Construction conforms to plan set. <br />
The URL can be used to link to this page
Your browser does not support the video tag.