Laserfiche WebLink
June 12, 2024 <br />1st Floor Exterior Walls: <br />❑ Front P2-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction Conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans: Construction Conforms to plan set. <br />o Panel Seam Construction. Note: (7) instances of the garage door horizontal straps per 4/SO6 were <br />observed to be missing at time of inspection. Builder was notified and provided pictures of a <br />resolution. Construction conforms to plan set. <br />o Anchor bolt spacing: Construction conforms to plan set. <br />❑ Rear P1-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />o Panel Seam Construction. Construction conforms to plan set. <br />o Anchor bolt spacing: Construction conforms to plan set. <br />Give me a call if you have any questions or comments. <br />Sincerely, <br />Aiden Bernhardt, P.E. <br />BTL Engineering <br />9 Page 2 <br />