Laserfiche WebLink
AIR BARRIER REQUIREMENT <br /> PER 2018 WASHINGTON STATE ENERGY CODE R402.4 A CONTINUOUS AIR BARRIER <br /> SHALL BE INSTALLED IN THE BUILDING ENVELOPE.EXTERIOR THERMAL ENVELOPE _ <br /> CONTAINS A CONTINUOUS AIR BARRIER.BREAKS OR JOINTS IN THE AIR BARRIER SHALL .- 3 <br /> BE SEALED.AIR PERMEABLE INSULATION SHALL NOT BE USED AS AS A SEALING <br /> MATERIAL ¢`; <br /> PROVIDE BUILDING AIR LEAKAGE TESTING WITH APPROVED BLOWER DOOR PER <br /> CEILING G.W.B.TAPED TO WALL INFORMATION BELOW.SUBMIT TESTING RESULTS TO JURISDICTION FOR APPROVAL. -- <br /> ' � G.W.B. <br /> SEAL G.W.B.PERIMETER <br /> OF DOOR&WINDOW BLOWER DOOR TEST d s <br /> OPENINGS II � $ <br /> SEAL G.W.B.TO TOP I I SEAL G.W.B.PERIMETER 2018 Washington Stale Energy Code(WSEC)section R402.4.1.2 requires air leakage testing for m o 3 <br /> all new houses and additions.The requirement is met if the structure has a leakage rate of 5 air <br /> PLATE AT ALL EXTERIOR OF DOORS WINDOW d <br /> WALLS I I OPENINGS changes per hour when depressurized with a blower door to 50 Pascals or less(5ACH50).A 3„ <br /> G.W.B.CAULKED TO TOP PLATE Pascal is a measurement of pressure.249 Pascals are equal to 1"of water column.The test must a�m <br /> be performed using a Blower Door device which consists of a large fan,a frame and panel.A <br /> manometer(pressure gauge)is used to read house and fan pressures. <br /> SHADED I I I ' WSEC states that the lest may be performed at any time after rough in.All penetrations in the <br /> building envelope must be sealed including those for utilities,plumbing,electrical,ventilation and <br /> COMPONENTS _ <br /> INDICATE ELEMENTS / I I I combustion appliances.The code also states that when required by the building official,the test w <br /> COMPRISING THE I I shall be conducted by an approved third party. _ N <br /> CONTINUOUS AIR I I I I <br /> I <br /> BARRIER ENCLOSURE I 1 conduct the test:.Close all windows,doors and fireplace and stove doors. <br /> 2.Close all dampers in <br /> exhaust,intake,make-up air,backdraft and <br /> G.W.B.CAULKED TO BOTTOM PLATE I I I I I I flue dampers.Since you will be depressurizing the house,dampers in bath <br /> I I I fans,etc.will be sucked closed during the test and will therefore not <br /> negatively affect the results. <br /> —BOTTOM PLATE CAULKED OR GASKETED I I I I 3.Make sure plumbing traps are filled with water. <br /> TO SUBFLOOR/CONCRETE SLAB AT I 4.Leave doors between heated areas open. <br /> SLAB ON GRADE CONDITIONS ( I I I 5.Open access hatches to conditioned attics and/or conditioned crawl <br /> I I I I spaces.Leave hatches closed if these are unconditioned areas. u. <br /> 6.Seal exterior openings for continuously operating ventilation systems and <br /> RIM JOIST CAULKED,GLUED OR I I heat recovery ventilators. <br /> GASKETED TO SUBFLOOR I 7.Turn off heating and cooling systems but do not seal supply or return <br /> registers. <br /> I 8.Adjust all combustion appliances so that they do not turn on during the <br /> test. <br /> GASKETED TO TOP PLATE <br /> II 9.Install the blower door in an exterior door opening and connect hoses from <br /> RIM JOIST CAULKED,GLUED OR I the manometer to the blower door fan and the exterior pressure tap.See <br /> manufacturer's instructions for correct set-up. <br /> / I SEAL G.W.B.TO FIRST 10.Depressurize the house to-50 Pascals. <br /> SEAL G.W.B.TO TOP STUD AT INTERIOR 11.Record the flow rate(with simple manometers,the fan pressure(Pa)is <br /> —G.W.B.CAULKED TO TOP PLATE PLATE WHEN ADJACENT PARTIITIONS converted to.CFMs using a flow table.Many digital manometers sold with <br /> TO UNCONDITIONED I blower Coors can automatically perform this conversion,and display m <br /> / ATTIC CFMw directly.)Consult your blower door and manometer manuals. L.L <br /> You now must convert the flow rate(CFMso)to ACHso. LU <br /> Use the following formula: Cc <br /> Cc <br /> ACHso=(CFM so X 60)/Volume Q <br /> e..L . ..TO SILL Where <br /> m <br /> PLATE AT ALL EXTERIOR ACH w=Air Changes per Hour at-50 Pascals <br /> G.W.B.CAULKED TO BOTTOM PLATE WALLS SEAL ALONG INSIDE OF CFMw X 60=Converts Cubic Feet per Minute to Cubic Feet per Ir <br /> BOTTOM OF FIRST STUD Hour <br /> AT IN <br /> WALL OR Volume=Conditoned floor area of the housing unit multiplied by <br /> BOTTOM PLATE CAULKED OR GASKETED HOLD BACK FIRST STUD the ceiling height <br /> TO SUBFLOOR/CONCRETE SLAB AT AND RUN G.W.B. <br /> - SLAB ON GRADE CONDITIONS CONTINUOUS Example:A blower door test has be.en done on a 2,000 square foot house <br /> and the fan flow(CFM50)rate is 1100 CFM. <br /> SUBFLOOR CAULKED,GLUED OR ALL ELECTRICAL PENETRATIONS AT EXTERIOR ACHso=(CFM50 X 60)1 Volume <br /> ACHso=(11 00 X 60)1(2000 X 8) <br /> GASKETED TO RIM JOIST WALLS TO USE AIR-SEALED BOXES.ALL WIRE ACHso=66,000/16,000 <br /> OPENINGS&PENETRATIONS SEALED WITH <br /> CAULK,PUTTY OR INTEGRAL SEAL. ACHso=4.1 <br /> RIM JOIST CAULKED OR GASKETED Since the code requires the ACHso to be less than 4,this house complies with an <br /> TO SILL PLATE SEAL G.W.B.TO BOX FLANGE WITH ACHso of 4.1.Record the ACHso on the energy certificate on or near the electrical <br /> CONTINUOUS BEAD OF CAULK OR ADHESIVE. panel. <br /> F"lP.T.SILL PLATE INSTALLED <br /> OVER CONTINUOUS SILL GASKET LU <br /> Q^ J <br /> J L = <br /> u <br /> > O <br /> U, <br /> Z O <br /> G.W.B AIR BARRIER-CONCEPTUAL EXTERIOR ALL SECTION G.W.B AIR BARRIER-CONCEPTUAL ISOMETRIC O w <br /> o L� <br /> Z <br /> LU U O <br /> m <br /> z <br /> a CONCEPTUAL INTERIOR AIR BARRIER SYSTEM-GYPSUM WALL BOARD(G.W.B.)METHOD <br /> a N.T.S. <br /> Z <br /> E <br /> v � � <br /> m <br /> G.W.B.ADHESIVE ON I SEALANT OR ADHESIVE <br /> CONTINUOUS BEAD <br /> BOTH SIDES OF FIRST E 'A <br /> BOTH <br /> \ 3UBFLOORADHESIV O s <br /> E INTERIOR STUD \ (Y <br /> 33 <br /> \ I \ JOB NO.: <br /> N \\\ I \ 22205 <br /> 0 <br /> P E <br /> W.B.AD SIVE SEALANT OR ADHESIVE - 12/5/2023227:06 PM <br /> ` ---_-- - -- _�- -� G. HE .. <br /> AT BOTTOM AND <br /> CONTINUOUS SEALANT AT TOP OF STUD <br /> FIXTURE PERIMETER TO \ DATE: 06/08/2023 <br /> G.W.B.---- -- / \\ y SCALE: 1"-V-0" <br /> I.C.RATED RECESSED I G.W.B \ E DRAWN: MB <br /> LIGHT FIXTURE G ADHEBNE <br /> AT BOTTOM AND \ CHCKD: TM <br /> TOP OF PLATE \ GENERAL SHEETS <br /> s <br /> SHEET NO.: <br /> SEALING AT RECESSED FIXTURES SEALING AT INTERSECTING WALLS SEALING AT RIM JOIST <br /> A19 <br /> u 3 N.T.S. 4 N.T.S. 5 N.T.S. <br />