My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA Geosciences, Inc. 1/24/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HWA Geosciences, Inc. 1/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 10:11:48 AM
Creation date
1/24/2025 10:10:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA Geosciences, Inc.
Approval Date
1/24/2025
Council Approval Date
12/18/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Geotechnical Services for Riverpoint Outfall Replacements
Tracking Number
0004670
Total Compensation
$43,638.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
November 7, 2024 <br />HWA Project No. 2024-P272-21 <br />Scope of Work 3 HWA GeoSciences Inc. <br />Each of the above-described geotechnical explorations will be logged by an HWA <br />geotechnical engineer or geologist. <br />GEOTECHNICAL ENGINEERING DESIGN SERVICES: <br />• Evaluate Geotechnical Field and Laboratory Data: Based on the CPT test results on <br />selected samples, HWA will generate estimates of the soil strength and other properties <br />needed to evaluate the effects the subsurface conditions will have on the proposed <br />improvements. <br />• Develop Geologic Cross-Sections: HWA will construct two geologic cross-sections, one <br />at each outfall location, as needed, for the project. The cross-sections will show near <br />surface soil conditions and will be provided in a geotechnical report. <br />• Generate Seismic Design Parameters: Based on the soils encountered along the <br />alignment, HWA will determine the Site Class for seismic design. The design spectral <br />acceleration parameters will then be selected in accordance with the AASHTO <br />Specifications for Road and Bridge. <br />• Slope Stability and Liquefaction Analyses and Recommendation: HWA will <br />conduct stability and liquefaction analyses for the proposed improvement and provide <br />geotechnical recommendations for design and construction of the proposed outfalls. <br />• HWA QA/QC: All design calculations and recommendations will be reviewed by a <br />senior principal prior to distribution to the design team. <br />• Prepare Draft Geotechnical Engineering Report: HWA will prepare a draft <br />geotechnical engineering report for the project. This report will contain the results of the <br />explorations and testing including descriptions of surface and subsurface conditions; a <br />site plan showing exploration locations and other pertinent features and summary <br />exploration logs. The report will also include the results of our engineering analyses and <br />provide geotechnical recommendations for the proposed improvements. <br />• Respond to Geotechnical Related Review Comments: HWA will provide written <br />responses to all review comments. The written responses shall be provided in the form of <br />emails to the design team. <br />• Prepare Final Geotechnical Engineering Report: HWA will prepare a final <br />geotechnical engineering report for the project once review comments are provided. <br />• Geotechnical Plan and Specification Review: HWA will collaborate with the design <br />team to verify that the geotechnical engineering requirements are properly incorporated <br />into the plans and specifications.
The URL can be used to link to this page
Your browser does not support the video tag.