My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA Geosciences, Inc. 1/24/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HWA Geosciences, Inc. 1/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 10:11:48 AM
Creation date
1/24/2025 10:10:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA Geosciences, Inc.
Approval Date
1/24/2025
Council Approval Date
12/18/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Geotechnical Services for Riverpoint Outfall Replacements
Tracking Number
0004670
Total Compensation
$43,638.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
November 7, 2024 <br />HWA Project No. 2024-P272-21 <br />Scope of Work 4 HWA GeoSciences Inc. <br />DELIVERABLES: <br />• Monthly status reports and invoices <br />• Subsurface Exploration Work Plan Memorandum <br />• Draft and Final Geotechnical Engineering Report <br />ASSUMPTIONS: <br />• No geotechnical data report or baseline report will be generated as part of this work. <br />• All costs are estimated and may be increased or decreased within the limits of the total <br />budget at the discretion of HWA's project manager. <br />• Site reconnaissance is limited to observation of existing topography and features; no <br />excavation or subsurface exploration will be conducted during site reconnaissance. <br />• The City will provide all necessary permits for the exploration work, including street-use <br />permit, right-of-way permits, right-of-entry permits, and temporary construction <br />easements (if required), at no cost to HWA. <br />• CPT locations will be located using handheld GPS and/or measurement from existing <br />known features. <br />• Utility locates, via the One-Call Utility Locate Center will be comprehensive and <br />accurate enough to allow reliable and safe location for explorations. Vacuum extraction <br />of CPT locations is not included. <br />• The geotechnical explorations proposed herein will not be used to assess site <br />environmental conditions. <br />• HWA assumes no coring will not be required prior to pushing the proposed. <br />• No Phase 1 or Phase 2 Environmental Site Assessment will be completed by the HWA. <br />• All CPT test conducted through the pavement will be patched with quick drying cement <br />or Aquaphalt. Saw cutting of the pavement or hot mix asphalt patches will not be <br />completed. <br />• The CPT test locations will be surveyed by others. <br />• All field works will be accomplished during normal daylight workdays and hours, with at <br />least a minimum of 8 hours available per day. <br />• Neither site specific PSHA nor site specific response analyses are included in this scope. <br />• Pavement investigation and pavement design is not part of this scope of work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.