My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sam’s Tree Care 1/23/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Sam’s Tree Care 1/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:36:36 PM
Creation date
1/24/2025 10:13:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sam’s Tree Care
Approval Date
1/23/2025
Council Approval Date
1/15/2025
End Date
6/30/2025
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap 2024 Snag Creation Project
Tracking Number
0004671
Total Compensation
$66,240.00
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Sam’s Tree Care 4/15/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Figure 12 – <br />CITY OF EVERETT <br />WATER QUALITY PROTECTION SPECIFICATIONS <br />I. DESCRIPTION <br /> Water from Lake Chaplain Reservoir is used to provide drinking water for the majority of <br />Snohomish County residents. The Contractor shall use EXTREME care to protect water quality in the <br />watershed. <br />REGULATIONS <br />A.Lake Chaplain and its tributaries are classified as “AA”, a designation reserved for very high <br />quality waterways. No discharge of any waste or wastewater will be permitted to the reservoir or its <br />tributary streams. <br />B.The Contractor shall comply with regulations from the Department of Health, Rules and <br />Regulations of the State Board of Health Regarding Public Water Systems (WAC 246-290) and <br />Department of Ecology Water Quality Standards for Waters of the State of Washington (WAC 173-201). <br />II.CONTRACTOR REQUIREMENTS <br />A. Compliance. The Contractor shall comply with the restrictions, requirements and methods <br />listed below and it shall be the Contractor’s responsibility to ensure that workers are fully aware of the <br />importance of maintaining high water quality in the watershed. All workers shall be familiar with these <br />water quality protection specifications and understand that violation may be grounds for dismissal <br />and/or Contract termination. <br />1.Site Requirements. The Contractor shall, where applicable, divert clean water around <br />construction sites and yard areas to reduce the amount of water subject to contamination. Temporary <br />ditches, culverts and dikes may be used. Contractor shall disturb areas no larger than necessary for work <br />yards and construction areas. <br />2.The Contractor shall not discharge waste of any type into the Lake Chaplain Reservoir or <br />its tributaries. <br />3.Contractor shall regularly instruct workers of the importance of maintaining sanitary <br />conditions in the watershed and complying with specifications as they pertain to water quality <br />protection. The Contractor shall make a copy of these specifications available to all workers in the <br />watershed. <br />4.Contractor shall not draw, dip or pump water from the Reservoir or its tributaries for <br />drinking, culinary or other construction purposes without the written approval of the City’s Contract
The URL can be used to link to this page
Your browser does not support the video tag.