Laserfiche WebLink
addresses and telephone numbers who can be contacted if a spill occurs during the Contractor’s <br />absence. <br />3.The Contractor shall immediately notify the City’s Project Manager or City of Everett <br />Filtration Plant at 425-257-8200 if an emergency condition occurs and maintain contact until the matter <br />is corrected. Containment and clean-up measures are subject to review and approval by the City’s Project <br />Manager. <br />4.Contractor shall provide and maintain at each active worksite an Emergency Oil spill kit <br />with enough capacity to effectively control a container or equipment leak and to contain & recover a <br />hazardous materials spill equal to the largest single on-site storage container volume. The Spill Kit shall <br />be kept in a clearly labeled, waterproof container and include (but not limited to) the following items in <br />appropriate quantities: <br />•Shovel <br />•Screened pitchfork <br />•Flashlight including batteries <br />•5-gallon containers with lids <br />•Oil absorbent pads/oil absorbent pellets <br />•30 gallon Plastic garbage bags