My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sam’s Tree Care 1/23/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Sam’s Tree Care 1/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:36:36 PM
Creation date
1/24/2025 10:13:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sam’s Tree Care
Approval Date
1/23/2025
Council Approval Date
1/15/2025
End Date
6/30/2025
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap 2024 Snag Creation Project
Tracking Number
0004671
Total Compensation
$66,240.00
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Sam’s Tree Care 4/15/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
6 <br />ATTACHMENT TO CONTRACT <br />(SPECIFICATIONS) <br />CHAPLAIN GAP SNAG TREE CREATION <br />1.0 GENERAL REQUIREMENTS <br />1.1 SCOPE OF WORK <br />The CONTRACTOR shall, in accordance with the requirements of this Specification, <br />create Snags (standing dead trees) and Decaying Live Trees (DLT; live-topped trees) <br />from live trees in designated units in the vicinity of Lake Chaplain, near Sultan, <br />Washington, as indicated in the attached Table and Figures. The CONTRACTOR shall <br />furnish all labor, equipment, supplies, and transportation necessary to create a total <br />of 288 snag trees scattered throughout nine (9) units in accordance with the <br />requirements of this Specification and as directed by the CITY’s authorized <br />representative. Two (2) Tree Climbers will be required at all times during the <br />performance of the work, for safety reasons. <br />1.2 LOCATION OF WORK <br />The nine work units are located in the vicinity of Lake Chaplain, seven miles north of <br />Sultan, Washington, near the water filtration plant of the City of Everett, Washington <br />(the CITY). The general vicinity of the work area is shown in Figure 2. Figures 3 - 11 <br />show the specific locations of the snags within each unit. The CONTRACTOR will be <br />required to sign in and out at the filtration building each day, and to abide by all rules <br />and requirements pertaining to accessing restricted areas. <br />1.3 ACCESS TO WORK ASSIGNMENTS <br />The CITY’s Project Manager will provide GPS coordinates and a map showing the work <br />area and will occasionally be on site while the CONTRACTOR is working. Access to all <br />units is via City of Everett watershed roads and access will be secured by the CITY for <br />the CONTRACTOR. Units 1, 7, 8, and 9 are located in the CITY’s restricted watershed, <br />which is closed to public access. The CONTRACTOR shall each day check in at the City <br />Filtration Plant prior to entering the units. Upon completion of the day’s work, the <br />CONTRACTOR shall check out at the Filtration Plant. Units are accessed via the roads <br />indicated on Figure 2, which may not be open year-round to vehicular access due to <br />weather-related events. Access within the forest is on foot only. <br />1.4 PROJECT MANAGER <br />The CITY's Project Manager for this Contract is:
The URL can be used to link to this page
Your browser does not support the video tag.