Laserfiche WebLink
6 <br />ATTACHMENT TO CONTRACT <br />(SPECIFICATIONS) <br />CHAPLAIN GAP SNAG TREE CREATION <br />1.0 GENERAL REQUIREMENTS <br />1.1 SCOPE OF WORK <br />The CONTRACTOR shall, in accordance with the requirements of this Specification, <br />create Snags (standing dead trees) and Decaying Live Trees (DLT; live-topped trees) <br />from live trees in designated units in the vicinity of Lake Chaplain, near Sultan, <br />Washington, as indicated in the attached Table and Figures. The CONTRACTOR shall <br />furnish all labor, equipment, supplies, and transportation necessary to create a total <br />of 288 snag trees scattered throughout nine (9) units in accordance with the <br />requirements of this Specification and as directed by the CITY’s authorized <br />representative. Two (2) Tree Climbers will be required at all times during the <br />performance of the work, for safety reasons. <br />1.2 LOCATION OF WORK <br />The nine work units are located in the vicinity of Lake Chaplain, seven miles north of <br />Sultan, Washington, near the water filtration plant of the City of Everett, Washington <br />(the CITY). The general vicinity of the work area is shown in Figure 2. Figures 3 - 11 <br />show the specific locations of the snags within each unit. The CONTRACTOR will be <br />required to sign in and out at the filtration building each day, and to abide by all rules <br />and requirements pertaining to accessing restricted areas. <br />1.3 ACCESS TO WORK ASSIGNMENTS <br />The CITY’s Project Manager will provide GPS coordinates and a map showing the work <br />area and will occasionally be on site while the CONTRACTOR is working. Access to all <br />units is via City of Everett watershed roads and access will be secured by the CITY for <br />the CONTRACTOR. Units 1, 7, 8, and 9 are located in the CITY’s restricted watershed, <br />which is closed to public access. The CONTRACTOR shall each day check in at the City <br />Filtration Plant prior to entering the units. Upon completion of the day’s work, the <br />CONTRACTOR shall check out at the Filtration Plant. Units are accessed via the roads <br />indicated on Figure 2, which may not be open year-round to vehicular access due to <br />weather-related events. Access within the forest is on foot only. <br />1.4 PROJECT MANAGER <br />The CITY's Project Manager for this Contract is: