Laserfiche WebLink
Fairway Estates MHP—Site Development and Public Works Permits—Park Driveway Entrance Remodel <br /> September 30, 2022 page 2 <br /> The documents submitted for the civil engineering design are prepared by Huitt Zollars, Inc. and are <br /> dated 4-13-22, and the landscape architecture design are prepared by Greey Pickett and are dated 4-7- <br /> 22. <br /> Hopefully these submittal documents and drawings will allow the city's plan reviewers to accomplish <br /> their review for the Site Development Permit and the Public Works Permit. <br /> Note: Under this permit application,there is no work to be performed on the Clubhouse, nor the two <br /> new homes sites, nor the renovation of the outdoor patios and amenities adjacent to the Clubhouse. <br /> Note: Structural engineering drawings for the new metal gates support posts and foundations shall be <br /> prepared by the gate fabrication subcontractor and will be submitted in the future under sperate permit <br /> after the subcontractor has been selected. <br /> Note:The park driveway entrance is not located near any wetlands or wetland buffers. <br /> Thank you for your valuable time to review out permit application package. <br /> Jay Pickering <br /> Development Manager for CPI Fairway Estates Owner, LLC <br /> Edwards Development &Advisors <br /> 8201 - 164t"Avenue NE, Suite 200 <br /> Redmond, WA 98052 <br /> iay.pickering@edwardsdev.com <br /> 206-310-6100 <br /> Owner Info: <br /> CPI Fairway Estates Owner, LLC <br /> c/o The Carlyle Group <br /> 1001 Pennsylvania Avenue NW <br /> Washington, DC 20004 <br />