Laserfiche WebLink
LEGEND <br /> CATWALK LEVEL SEE SHEET EO FOR SYMBOLS AND ABBREVIATIONS <br /> — SEE SHEET E506 FOR FIRE ALARM ABBREVIATIONS <br /> 5TH FLOOR <br /> I I <br /> 4TH FLOOR <br /> GENERAL NOTES <br /> 1. RISER MAY NOT NOT SHOW ALL FIELD DEVICES, SEE <br /> PLAN SHEETS FOR LOCATIONS OF EQUIPMENT. <br /> 2. THE RACEWAY CONFIGURATION AND ROUTING SHOWN ARE <br /> DIAGRAMMATIC AND DO NOT NECESSARILY REPRESENT <br /> 3RD FLOOR ACTUAL INSTALLATION. FINAL PATHS SHALL BE <br /> — — — — — — — — DETERMINED BY ELECTRICAL CONTRACTOR. <br /> I I A REFERENCE DRAWINGS <br /> SHEET E506-4 - ELEVATOR 58/59 FIRE ALARM SYSTEM. <br /> 2ND FLOOR SHEET 40-YD-TNE268 - FIRE A ARM PLAN TUNNEL <br /> 1 S 1.01' <br /> S A @ FACP <br /> MAN PULL <br /> F @ FACP <br /> A 40-35 FACP A <br /> @ M.5/7.2 <br /> 0 <br /> ELEVATORS 58/59 1:10:1 ELEV 58/59 FA CONSTRUCTION NOTES <br /> 1 FACP 1:10:2 ELEV 58/59 TRBL <br /> EVT-FA-40-35 1]::::-PROVIDE AND INSTALL TAMPER SWITCH AND WATERFLOW <br /> SWITCH AT NEW CONNECTION POINT AT ENTRY TO THE <br /> NEW SECTION OF TUNNEL. MATCH EXISTING POTTER <br /> MODELS USED THROUGHOUT 40-35 BUILDING. <br /> EMERGENCY 120VAC POWER <br /> X2V35-2UN13.5/14 12:::-PROVIDE AND INSTALL HOMERUN CONDUIT AND CABLE <br /> BACK TO FACP IN 40-35 BLDG. MATCH CABLE TYPE. <br /> 5 <br /> 3. COORDINATE WITH BOEING PROJECT TO RETAIN THE <br /> SERVICES OF BOEING FIRE ALARM SYSTEM CONTRACTOR <br /> o FOR FACP TERMINATIONS, PROGRAMMING AND <br /> 1:07:2 SV35-6 COMMISSIONING. <br /> 1 <br /> w 1:08:2 SV35-8 ISO TAMPER 1:05:2 SV35-2 ISO TAMPER 1:03:2 SV35-1 ISO TAMPER <br /> & 1:09:2 SV35-10 ISO TAMPER ISO TAMPER <br /> 1:07:1 SV35-6 1:05:1 SV35-2 WE PRESSURE 1:03:1 SV35-1 WE PRESSURE <br /> 1:14 SV36-T2 WE 1:09:1 SV35-10 WF PRESSURE 1:08:1 SV35-8�� WE PRESSURE <br /> WE PRESSURE VS 1:04:2 SV35-T1 ISO TAMPER <br /> GAYLORD 1:06:2 SV35-4 ISO TAMPER VS WF <br /> o � WF WF PD WF PD WF PD WF PD RD <br /> (UV35E4A) ��wFRD PD 1:04:1 SV35—T1 WE PRESSURE <br /> 1:06:1 SV35-4 WE PRESSURE wF <br /> :11:1 GAYLORD FA <br /> N :11:2 GAYLORD TRBL <br /> FIRST FLOOR <br /> I I <br /> 1:15 SV36-12 TAMPER 1:09:3 SV35-10 TAMPER VS 1:08:3 SV35-8 VS 1:07:3 SV35-6 TAMPER VS 1:05:3 SV35-2 TAMPER[! vs 1:03:3 SV35-1 TAMPER <br /> TAMPER 1:05:3 SV35-4 TAMPER VS 1:04:3 SV35—T1 TAMPER <br /> IN YARD TUNNEL ENTRY <br /> VS 1:13:1 SV35-3 TAMPER <br /> o wF 1:13:2 SV35-3 WE <br /> I <br /> MI <br /> I <br /> UNNEL qg <br /> — — — — — — — — — — — — — — Timothy C.Eastman-25� 3�2'T <br /> 40-36 40-35 WEST 40-35 EAST APRON TUNNEL NICET C � <br /> oretaMs Level IV <br /> rti irztion Ex ire March 01,2025 <br /> PO A� BOX 1138 <br /> AUBURN,WA 98071 SEATRONICS 253-939-6060 <br /> 1 FIRE PROTEC110N SERVICES B xo. oxG xo. <br /> w 8401445 8401445—E506-5 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A A SUBTITLE CURRENT REVISION SYMBOL DATE <br /> TAhCC ACCEPTABILITY <br /> BIL o SEA 08.12.24 FIRE ALARM SYSTEM RISER DIAGRAM A 08.12.24 <br /> - EVERETT FIRE PANEL REPLACEMENT- RECORD W2640474 SAZAN/ZO 01.25.19 SEA 08.12.24 SHEET SEQUENCE No. <br /> A 40-36 FSI SEA SEA 08.12.24 SPECIFICATION IS APPROVED 40-36 FSI <br /> N IN E <br /> w BOE//VG APPROVED BY DEPT. DATE <br /> CHECKED E506 5 5 <br /> APPROVED BUILDING 40-035 JOB NO. <br /> APPROVED ELECTRICAL MASTER EVERETT, WA Dw0 NO. 40-035—E506-5 <br /> WAS 40-35-E513 <br />