Laserfiche WebLink
LEGEND/SCHEDULE <br /> 1. SEE SHEET EO. <br /> 2. FOR LIGHT FIXTURE SCHEDULE, SEE SHEET <br /> 40-YD-506-2. <br /> 2�3V35-2WM14AD/9 <br /> (2)2"C, 3#4/0, #6G M <br /> 2�3V35-2WM13.5AD/2 <br /> (2)2"C, 3#4/0, #6G <br /> 2�(2)2" C.O. DATA TO HARDSTAND 3 A GENERAL NOTES <br /> 2�(4)2" C.O. SPARE TT i (2)2"C.0. SPARE (1) 2-1/2"C, 3#250, #4GA E5 —5E5 0-4 <br /> (1) 2-1/2" COMM. (NP) <br /> 1 4.5 2"C.O. DATA <br /> 2V35-2TN/17a�2 <br /> / �� 3/4"C, 2#12, #12G <br /> GFCI 13a GFCI 3a GFCI 13a GFCI Sl�_ <br /> ©TO PANEL 11 E11 1 E11 E11 E11 E1 E11 11 E11 1 E11 \ i59 <br /> 4V35-2M12.5BD IN REFERENCE DRAWINGS <br /> r <br /> 10 11 12(YP) SLOPE oawN B 1�40-35—TNE23 PARTIAL TUNNEL LEVEL <br /> 7 FLOW SWITC +8.5' 11 11 LIGHTING PLAN <br /> XV35-2UN13.5/11 (TYp) —1 <br /> 7 TAMPER SWITCH 3/4"C, 2#8, #8G 15 15 15 15 '7 15 15 15 15 15 15 LL>40—YD—E110-42 60HZ POWER, 480Y/277V <br /> \ KK (TYP) <br /> 32 +10' 0 <br /> E8 CONSTRUCTION NOTES <br /> L (2)2"C.O. SPAREA <br /> �PROVIDE AND INSTALL GFCI DUPLEX RECEPTACLE <br /> 1 FOR CONTINUATION, r 2"C.O. DATA (gip) MOUNTED AT 1'-6" ABOVE FINISHED FLOOR. <br /> SEE SHEET 40-35—TNE2 TO HARDSTAND 4 EL> <br /> PROVIDE AND INSTALL CONDUIT, CONDUCTORS, <br /> 3V35-2M13/15 AND ANCILLARY HARDWARE. SEAL WALL <br /> PENETRATIONS PER CIVIL PLANS WHERE <br /> APPLICABLE. <br /> FACP EVT—FA-40-35A PROVIDE AND INSTALL JUNCTION BOX FOR POWER <br /> TO AUTOMATIC DOOR OPENER. PROVIDE CONDUIT <br /> B TO PUSH BUTTON FOR LOW VOLTAGE WIRING. <br /> ®PROVIDE AND INSTALL 120V RECEPTACLE ON <br /> DEDICATED CIRCUIT FOR POWER TO SUMP PUMP. <br /> MOUNT RECEPTACLE IN SUMP PIT NEAR PUMP. <br /> COORDINATE WITH MECHANICAL ON EXACT <br /> LOCATION. <br /> PANEL 4V35-2TN PANEL 2V35-2TN <br /> PROVIDE AND INSTALL JUNCTION BOX SIZED PER <br /> ELECTRICAL ROOM r— — NEC. <br /> ©PROVIDE AND INSTALL CONDUIT, CONDUCTORS, <br /> 0 40— D—E590-6 AND ANCILLARY HARDWARE FROM PANEL TO NEW <br /> �2V35-2TN/19a ELECTRICAL ROOM. MOUNT CONDUIT ALONG NORTH <br /> 3/4"C, 2#12, #12G 2 B WALL OF TUNNEL WITHIN ALLOCATED UTILITY SPACE <br /> (1) 2-1/2"C, 3#250, #4GA 40— D—E590-6 AT APPROXIMATELY 2'-0" BELOW CEILING. <br /> �2V35-2TN/13o EF-9B TO MOTOR <br /> (1) 2-1/2" COMM. (NP) 3/4"C, 2#12, #12G 3.0 STARTER PROVIDE AND INSTALL TERMINATIONS TO TAMPER <br /> 3/4"C, 6#12, #12GA SWITCH AND VANE FLOW SWITCH AT ENTRY TO <br /> THE NEW SECTION OF TUNNEL. MATCH EXISTING <br /> GFCI 13a GFCI 13a GFCI 13a 4GFCI o % POTTER MODELS USED THROUGHOUT 40-35 <br /> BUILDING. <br /> 5 11 11 1 1 TUNNEL 11 11 1 11 11 11 1 1 <br /> E E ___ E E E E E E E E E E <br /> E� SPP-6p ®PROVIDE AND INSTALL 1/2" CONDUIT AND CABLE <br /> TN02NA <br /> I BACK TO FACE IN 40-35 BLDG. MATCH EXISTING <br /> - — -,r _ _ _ _ _ _ - y_ _ _ _ _ 7.5 _ _E _ - - CL TUNNEL CABLE TYPE. <br /> 1 11 r ------ - 11 11 2 35-2TN/12aA 9. COORDINATE WITH BOEING PROJECT TO RETAIN <br /> 15 15 15 A-- 15 15 t 15 15 1 15 15 15 15 3 3 4"C, 2#12, #12G THE SERVICES OF BOEING FIRE ALARM SYSTEM <br /> CONTRACTOR FOR FACP TERMINATIONS, <br /> PROGRAMMING AND COMMISSIONING. <br /> PROVIDE AND INSTALL LIGHT FIXTURE PER THE <br /> TUEF-9A LIGHT FIXTURE SCHEDULE OR EQUIVALENT AT THE <br /> LOCATION SHOWN. PROVIDE AND INSTALL <br /> w E5�4E590-5 <br /> 6-4E5 <br /> MOUNTING HARDWARE AS NEEDED. <br /> E590-5 <br /> Ej�:-PROVIDE AND INSTALL CONDUCTORS, CONDUIT, <br /> i AND ANCILLARY HARDWARE. <br /> REMOVE BALLAST OF LIGHT FIXTURE AND INSTALL <br /> RETROFIT. REFER TO MANUFACTURER'S <br /> INSTALLATION DOCUMENTS. <br /> SCALE: Q,ENLARGED TUNNEL TN 10r 2AN60-42, TNE110-42, TNE260—' 2AE5 0-5 BODIES <br /> PROVIDE <br /> AND INSTALL OVERS17ED B CONDUIT WITH REDUCING BUSHINGS <br /> CONDUIT SIZES. <br /> 0 <br /> I <br /> 8 4' 0 4' 8' 16' Timothy C.Eastman - <br /> i e f2�53- <br /> NICET �IV� Q`T <br /> Po RBNO,Xw-1 i93aam <br /> 1LevelQ AUB <br /> SCALE: 1/$=1 -0 SEATRONICS 253-939A60609Jt,21.1tlon EMs:Mrch 01,2025 FIRE PROTCnON SERVICES <br /> k <br /> 106835171 w 1o0. <br /> 683517-E590-5 <br /> SYM REVISION BY APPROVED DATE SYM REV1510N BY APPROVED DATE ACCEPTABILITY AWN A BTITLE CURRENT REVISION SYMBOL DATE <br /> 57 B.ARZADON 12.05.23 SU <br /> ORIG BUILD BACK, PHASE 3 CASNE DAT 12.21.23 THIS DESIGN AND/OR CHECKED TUNNEL PLANS A 06.05.24 <br /> SPECIFICATION IS APPROVED A. GRIFFITH 12.05.23 SHEET SEQUENCE No. <br /> ENGINEER N /LE 40-81 82 BUILD BACK, PHASE 3 E590-5 5 <br /> ORIG-01 40-81/82 BUILD BACK - DCN-01 APRON UTILITIES 28668271 CASNE DAL 03.25.24 BOE//VG APPROVED BY DEPT. DATE A. GRIFFITH 12.05.23 <br /> CHECKED <br /> i A 40-81/82 BUILD RACK SEA SEA 06,05.24 D.TOWNSEND 12.05.23 APPROVED SITE 40-YD <br /> B 40-81/82 BUILD BACK - BOEING REVISIONS SEA SEA 07,05.24 <br /> APPROVED ELECTRICAL MASTER EVERETT, WA DWG NO, 40-YD-E590-5 <br />