Laserfiche WebLink
LEGEND <br /> CATWALK LEVEL SEE SHEET EO FOR SYMBOLS AND ABBREVIATIONS <br /> — — — — — SEE SHEET E506 FOR FIRE ALARM ABBREVIATIONS <br /> 5TH FLOOR <br /> I <br /> 4TH FLOOR <br /> GENERAL NOTES <br /> 1. RISER MAY NOT NOT SHOW ALL FIELD DEVICES, SEE <br /> PLAN SHEETS FOR LOCATIONS OF EQUIPMENT. <br /> 2. THE RACEWAY CONFIGURATION AND ROUTING SHOWN ARE <br /> DIAGRAMMATIC AND DO NOT NECESSARILY REPRESENT <br /> 3RD FLOOR ACTUAL INSTALLATION. FINAL PATHS SHALL BE <br /> DETERMINED BY ELECTRICAL CONTRACTOR. <br /> I B REFERENCE DRAWINGS <br /> 1� SHEET E506-4 - ELEVATOR 58/59 FIRE ALARM SYSTEM. <br /> 2ND FLOOR SHEET 40-YD-TNE240-42 - FIRE ALARM P AN TUNNEL <br /> I S 1:01 <br /> SMK @ FACP <br /> MAN PULL <br /> F @ FACE <br /> 40-35 FACE <br /> I @ M.5/7.2 <br /> ELEVATORS <br /> 58/59 1:10:1 ELEV 58/59 FA F <br /> TRUCTION NOTES <br /> 1 FACP 1:10:2 ELEV 58/59 TRBL <br /> EVT-FA-40-35 D INSTALL TAMPER SWITCH AND PRESSURE <br /> NEW CONNECTION POINT AT ENTRY TO THE <br /> K - N OF TUNNEL. MATCH EXISTING POTTER <br /> ED THROUGHOUT 40-35 BUILDING. <br /> EMERGENCY 120VAC POWER <br /> X2V35-2UN13.5/14 D INSTALL HOMERUN CONDUIT AND CABLE <br /> ACP IN 40-35 BLDG. MATCH CABLE TYPE. <br /> 3. COORDINATE WITH BOEING PROJECT TO RETAIN THE <br /> SERVICES OF BOEING FIRE ALARM SYSTEM CONTRACTOR <br /> FOR FACP TERMINATIONS, PROGRAMMING AND <br /> 5 COMMISSIONING. <br /> 1:07:2 SV35-6 <br /> 1:08:2 SV35-8 ISO TAMPER 1:05:2 SV35-2 ISO TAMPER 1:03:2 SV35-1 ISO TAMPER <br /> 1:09:2 SV35-10 ISO TAMPER ISO TAMPER <br /> 1:07:1 SV35-6 1:05:1 SV35-2 WE PRESSURE 1:03:1 SV35-1 WE PRESSURE <br /> & 1:09:1 SV35-10 WE PRESSURE 1:08:1 SV35-8 WE PRESSURE <br /> o WF PRESSURE GAYLORD vs 04:2 SV35-Ti ISO TAMPER <br /> VS VS VS 1:06:2 SV35-4 ISO TAMPER vs <br /> PD PD WF <br /> wF WF PANEL PD WE PD 04:1 SV35-T1 WE PRESSURE <br /> (UV35-4A) 1:06:1 SV35-4 WE PRESSURE�_vsWIF PID <br /> PI)WF <br /> 1:11:1 GAYLORD FA <br /> 1:11:2 GAYLORD TRBL <br /> N FIRST FLOOR <br /> E <br /> I <br /> _ 1:09:3 SV35-10 TAMPER vs 1:08:3 SV35-8 vS 1:07:3 SV35-6 TAMPER VS 1:05:3 SV35-2 TAMPER vS L'�l:03:3 SV35-1 TAMPER <br /> TAMPER 1:05:3 SV35-4 TAMPER - R <br /> x IN YARD TUNNEL ENTRY <br /> o v5 1:13:1 SV35-3 TAMPER 1 <br /> WF 1:13:2 SV35-3 WE <br /> I <br /> I <br /> 0 <br /> TUNNEL <br /> 40-35 WEST 40-35 EAST APRON TUNNEL Timothy C.Eastman -256 NICET C �C2IirQn 1� . Po Box 1138 <br /> fl e Level IV AUBURN,WA 98071 <br /> (FJ SEATRON�CS 253-939-6060 <br /> lti�tion ExLreswaTeAwn:March 01,2025 RRE PROTECTION SERVICES JOR xo. owG xO. <br /> voiovn 10683517 10683517-E506 <br /> SYM REVISION BY APPROVED GATE SYM REVISION BY APPROVED D=TE ACCEPTABILITY SEA 052824 SUBTITLE CURRENT REVISION SYMBOL DATE <br /> DRAW DATE <br /> / - EVERETT FIRE PANEL REPLACEMENT- RECORD W2640474 SAZAN/ZO 01.25.19 rHls DESIGN AND/OR CHECKED FIRE ALARM SYSTEM RISER DIAGRAM A 05.28.24 <br /> U SPECIFICATION IS APPROVED SEA 05.28.24 SHEET SEQUENCE NO. o <br /> A 40-81/82 BUILD BACK, PHASE 3 SEA SEA 05.28.24 TITLE <br /> BOE/A/G APPROVED BY DEPT. DATE " " 40-81/82 BUILD BACK, PHASE 3 E506-5 6 <br /> f B 40-81/82 BUILD BACK - BOEING REVISIONS SEA SEA 07.05.24 CHECKED <br /> APPROVED BUILDING 40-035 JOB NO. <br /> j APPROVED ELECTRICAL MASTER EVERETT, Wq DVG No, 40-035-E506-5 <br /> WAS 40-35-E513 <br />