My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 1/27/2025 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group Inc. 1/27/2025 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 3:53:04 PM
Creation date
1/28/2025 3:52:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
1/27/2025
Council Approval Date
1/22/2025
End Date
12/31/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002775
Total Compensation
$309,641.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
December 2024 Page 1 of 9 Jacobs Engineering Group Exhibit A-1 Amendment No. 2 Bid Document Closeout Services --------------------- City of Everett SCOPE OF SERVICES CSO Storage at 36th ST, UP 3765 --------------------- Jacobs Engineering Group December 2024 1. PROJECT UNDERSTANDING The City of Everett, Washington (City) is designing improvements to the City’s combined sewer system to reduce combined sewer overflow (CSO) discharges at NPDES permitted outfalls SRO7 and SRO8. The improvements are part of a plan to comply with the Department of Ecology (DOE) requirement of no more than one CSO event per year per outfall averaged over a moving 20-year period. Jacobs Engineering Group (Consultant) performed conceptual design and sizing of a CSO storage facility at 36th Street, combined sewer pipe upgrades on Pacific Avenue, and modified diversion controls to storage and overflow facilities associated with SRO7 and SRO8. During the design phase, the City requested additional out of scope work be preformed in support of the project. To date, with prior City approval, Jacobs has completed these tasks (listed in Section 3 below) utilizing the existing project budgets. To complete the Issue for Bid (IFB) packages for the 36th Street CSO Storage Tank and Pacific Avenue Pipeline Improvements, the Consultant is requesting the additional budget outlined in this scope. Additionally, the City has requested that Jacobs prepare and obtain a Shoring Permit from BNSF as part of design and to perform a Storm Sensitivity Analysis based on updated storm series information that developed by the City. This Amendment No. 2 includes budgets to complete IFB packages and complete the BNSF shoring permit and Storm Sensitivity Analysis, as well as project management and final geotechnical data collection and report preparation. 2. ASSUMPTIONS FOR AMENDMENT NO. 2 This scope of work is based on the following assumptions: • This scope extends the budget for this project to complete the design phase services and provide support through bidding, with work occurring approximately between January 2025 through May 2025. • Deliverables will be in electronic format. • Meetings will be held virtually.
The URL can be used to link to this page
Your browser does not support the video tag.