My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 54TH ST SW I Geotech Report 2025-01-29
>
Address Records
>
54TH ST SW
>
600
>
Geotech Report
>
600 54TH ST SW I Geotech Report 2025-01-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 7:09:48 AM
Creation date
1/29/2025 7:09:04 AM
Metadata
Fields
Template:
Address Document
Street Name
54TH ST SW
Street Number
600
Unit
I
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL INVESTIGATION <br /> EVERETT,WASHINGTON <br /> March 2,2018 <br /> The native soils below the vegetation and topsoil(and fill)consist of glacial till and outwash-like <br /> materials. These materials are generally considered suitable for use as structural fill provided they are <br /> within 3 percent of the optimum moisture content. It should be noted that glacial till soil materials are <br /> typically suitable for structural fill during the summer months only if they can be dried to optimum <br /> moisture levels. The sandy outwash materials may require some drying;however,the fines content was <br /> generally low,indicating suitability during a majority of weather conditions. <br /> Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches <br /> and less than 5 percent fines(material passing the U.S.Standard No.200 Sieve). Structural fill should be <br /> placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of <br /> the modified proctor maximum dry density,as determined by the ASTM D 1557 test method. <br /> 8.1.2 Temporary Excavations <br /> Based on our understanding of the project,we anticipate that the grading could include local cuts on the <br /> order of approximately io feet or less for detention vault construction. The location of any stormwater <br /> vault has not been finalized;therefore,the temporary excavation angles cannot be fully determined. For <br /> reference,excavations should be sloped no steeper than 3/4H:1V(Horizontal:Vertical)in dense to very <br /> dense glacial till(where present),1H:1V in medium dense to dense native soils,and 1.5H:1V in fill soils. If <br /> an excavation is subject to heavy vibration or surcharge loads,we recommend that the excavations be <br /> sloped no steeper than 2H:1V,where room permits. We can provide specific temporary slope angles once <br /> the locations of any excavations have been determined. <br /> Temporary cuts should be in accordance with the Washington Administrative Code(WAC)Part N, <br /> Excavation,Trenching,and Shoring. Temporary slopes should be visually inspected daily by a qualified <br /> person during construction activities and the inspections should be documented in daily reports. The <br /> contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope <br /> erosion during construction. <br /> Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather,and the <br /> slopes should be closely monitored until the permanent retaining systems or slope configurations are <br /> complete. Materials should not be stored or equipment operated within io feet of the top of any <br /> temporary cut slope. <br /> Soil conditions may not be completely known from the geotechnical investigation. In the case of <br /> temporary cuts,the existing soil conditions may not be completely revealed until the excavation work <br /> exposes the soil. Typically,as excavation work progresses the maximum inclination of temporary slopes <br /> will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be <br /> made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be <br /> adjustable,to deal with unanticipated conditions,so that the project can proceed and required deadlines <br /> can be met. <br /> If any variations or undesirable conditions are encountered during construction,we should be notified so <br /> that supplemental recommendations can be made. If room constraints or groundwater conditions do not <br /> permit temporary slopes to be cut to the maximum angles allowed by the WAC,temporary shoring <br /> systems may be required. The contractor should be responsible for developing temporary shoring <br /> systems,if needed. We recommend that Cobalt Geosciences and the project structural engineer review <br /> temporary shoring designs prior to installation,to verify the suitability of the proposed systems. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.