Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 3/27/2020 <br /> City of Everett Permit Services Public Works Permit#: PWW2003-003 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: REV1119-037 <br /> WASHINGTON 425-257-8810 Public Works Fee: $90.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> THOMAS JAMES A& ROBIN M LAUFENBERG JOHN <br /> 9307 18TH AVE W <br /> EVERETT,WA,98204 <br /> PHONE:4253593070 PHONE:4253373174 <br /> TAX PARCEL ID#:00480600103903 SITE ADDRESS:9307 18TH AVE W <br /> DESCRIPTION: RESPONSE TO VIOLATION OF UNPERMITTED REMOVAL OF A BEAVER DAM <br /> AND STREAMBANK VEGETATION <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 06/11/2020.Approved plans must remain on job-site at all times. <br /> S. Project must comply with Conditions of Approval for REV1119-037;additonal action required prior to permit approval. <br /> 6. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 7.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing <br /> Planning Landscape inspection under"My Active Inspections" in your dashboard on the Online Permitting Portal. <br /> 8. Prior to permit final,the applicant shall record a CA Covenant and CASP with Snohomish County and submit a maintenance <br /> assurance device. <br /> 9.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control.......................................$50.00 <br /> PW Plan Review.....................................$20.00 <br /> PW Site Inspection..............................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />