3. Temporary erosion and sedimentation control (TESC) measures for construction activity must be <br /> operational prior to commencement of any clearing or earthwork.An approved permit and SWPPP <br /> for this work is required prior to set-up of TESC measures on-site.All BMPs must comply with City of <br /> Everett Design and Construction Standards and Specifications for Development. <br /> 4. All exposed ground must be reseeded or covered with final materials within 30 days of the <br /> completion of construction. If reseeding is not practical due to weather or seasonal restraints, the <br /> ground must be covered with mulch as directed by the City Engineer. <br /> 5. City streets are to be kept clear of dirt and debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. <br /> 6. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 7. In general, please call out all utilities and site features in accordance with the specific type and <br /> standard drawing number listed in the City's current Design and Construction Standards and <br /> Specifications for Development. https://everettwa.Rov/1531/De sign-Co nstruction-Standards <br /> 8. Please clearly label all features as either existing or proposed and clearly show on the site plan using <br /> specific line types, hatch patterns, and a legend. <br /> 9. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> Page 3 of 3 <br /> REVI119-037 <br /> EVERETT <br />