My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/01/29 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/01/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:58:09 PM
Creation date
1/29/2025 2:55:28 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/29/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: An Ordinance Creating a Special Improvements Project Entitled “Drew Nielsen Park Playground <br />Replacement”, Fund 354, Program 102, to Accumulate All Costs for the Project in the Amount of <br />$345,000 <br />Council Bill # <br />CB 2501-10 <br />Project: Drew Nielsen Park Renovation Project <br />Partner/Supplier: King County Directors’ Association (KCDA) <br /> Location: Colby & 13th St, Everett, WA 98201 <br />Preceding action: None <br />Fund: Fund 354, Program 102 (CIP-3) <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action 1/29/2025 <br />Proposed action 2/05/2025 <br />Consent <br />Action 2/12/2025 <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Funding Ordinance <br /> <br />Department(s) involved: <br />Parks and Facilities <br /> <br />Contact person: <br />Bob Leonard <br /> <br />Phone number: <br />425 257-8335 <br /> <br />Email: <br />Bleonard@everettwa.gov <br />Initialed by: <br /> RML <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The proposed Ordinance will provide funding for the Drew Nielsen Park playground <br />equipment replacement and surfacing material at an estimated cost of $345,000. <br />This project is identified in the CIP-3 financial model. Equipment procurement and <br />installation will be through King County Directors Association (KCDA) Cooperative. <br /> <br />Project summary statement: <br />This project will renovate the playground area at Drew Nielsen Park. The playground has <br />reached its end of life and exceeds the City of Everett Park’s life-cycle standard of 15 <br />years. Replacement of the existing playground equipment will update the playground to <br />current industry standards and add options for accessible play. Playground replacement <br />work includes demolition of the existing playground, construction of new forever lawn <br />safety surfacing system, installation of the new playground equipment, expansion of play <br />area, and certification of the design and installation. <br /> <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Drew Nielsen Park <br />Playground Replacement”, Fund 354, Program 102 to accumulate all costs for the project <br />in the amount of $345,000. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.