My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
130 W INTERCITY AVE 2025-01-31
>
Address Records
>
W INTERCITY AVE
>
130
>
130 W INTERCITY AVE 2025-01-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 3:25:32 PM
Creation date
1/29/2025 3:13:12 PM
Metadata
Fields
Template:
Address Document
Street Name
W INTERCITY AVE
Street Number
130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHI NGTON <br /> January 15, 2021 <br /> Mr. Joey Perez, <br /> Drafting Northwest <br /> 1921 761h Avenue SE <br /> Lake Stevens, WA 98258 <br /> Email Address: draftnw@gmail.com <br /> RE: Owner: Lidia Kebaya <br /> Job Address: 130 W Intercity Avenue <br /> Plan Check Number: B2012-026, First Building Review <br /> Dear Mr. Perez, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following comments reference the Everett Municipal Code (EMC), <br /> 2015 International Residential Code (IRC), 2015 International Building Code (IBC), and the <br /> residential provisions of the 2015 Washington State Energy Code (WSEC). Amendments to the <br /> building codes by the Washington Administrative Code (WAC) are identified. Citations provided in <br /> the comments reference the IRC unless noted otherwise. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of the structural calculations. <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.