Laserfiche WebLink
Does the project discharge to Flow Control Exempt Waters(per Minimum Requirement(MR)#7)? <br /> Yes <br /> REQUIRED: Implement the following BMPs NO <br /> where feasible: <br /> • BMP T5.13: Post-Construction Soil Quality V No(the <br /> and Depth Does the project project <br /> • BMP T5.10A, B,or C:Downspout Full trigger only MRs 01 - triggered <br /> Infiltration, Downspout Dispersion #5?(Per Figure 3.2 or only MR#2) <br /> Systems,or Perforated Stub-out Figure 3.3 in Appendix No additional <br /> Connections 1 of the 2013-2018 requirements <br /> • BMP T5.11 or T5.12: Concentrated Flow WWA Phase II Permit <br /> Dispersion or Sheet Flow Dispersion &Phase I Permit). <br /> NOT REQUIRED:Achievement of the LIDZStandard? REQUIRED: <br /> No he project triggered <br /> Performance Standard.Applying the other Yonly MRs#1 -#9) <br /> BMPs in List#1 or List#2. <br /> Isroject inside the UGA? <br /> Did the project developer choose to meet <br /> the LID Performance Standard? No <br /> No Is the project on a parcel <br /> of 5 acres or larger? <br /> REQUIRED: For each Did the p1jp Y@S <br /> surface,consider the choose <br /> BMPs in the order PerformREQUIRED:Meet the LID <br /> listed in List#1 for that Performance Standard through <br /> ::; <br /> type of surface_Use Yes the use of�BMP(s)in the <br /> the first BMP that is Yes NO 2014 SWMMWW except for <br /> considered feasible. Rain Gardens(the use of <br /> Bioretention is acceptable). <br /> NOT REQUIRED: <br /> Achievement of the LID If the project can't meet the <br /> Performance Standard. REQUIRED: For each LID Performance Standard, it <br /> IF surface, consider the BMPs must seek and be granted an <br /> REQUIRED:Meet the LID Performance in the order listed in List#2 exceptionivariance. <br /> Standard through the use of any BMP(s)in for that type of surface.Use <br /> the 2014 SWMMWW except for Rain Gardens the first BMP that is REQUIRED:Apply BMP T5.13 <br /> (the use of bloretention is acceptable). considered feasible. Post-Construction Soil Quality <br /> and Depth. <br /> REQUIRED for Projects Triggering MR#1-9*: NOT REQUIRED: <br /> Apply BMP T5.13 Post Construction Soil Achievement of the LID NOT REQUIRED:Applying the <br /> Quality and Depth. Performance Standard. BMPs in List#1 or List#2. <br /> NOT REQUIRED:Applying the BMPs in List <br /> #1 or List#2. *Recommended by Ecology for projects triggering MRs#1 -#5. <br /> r► Figure I-2.5.1 <br /> Flow Chart for Determining LID MR #5 <br /> DEPARTMENT OF Requirements <br /> E=r+n j n n V Revised June 2015 <br />