Laserfiche WebLink
Terri Jorgenson <br /> From: Terri Jorgenson <br /> Sent: Friday, July 9, 2021 12:01 PM <br /> To: LADABLACK@MSN.COM <br /> Subject: PW2106-068 2522 BAKER AVE <br /> Attachments: PW2106-068_PW 1 stReviewRedli nes(7-9-2021).pdf <br /> Hello Larry, <br /> A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made <br /> and/or the following conditions must be met: <br /> • This property is located in the Combined sewer basin and must meet requirements in Volume I, Section 6-10 of <br /> the City's Design & Construction Standards and Specifications (DCSS). <br /> o Prepare a drainage report using the Small Project Stormwater Report Template for Combined Area <br /> (PDF). <br /> • The side sewer under the proposed building shall either be sleeved or re-routed to not be located under a <br /> structure. Show on the site plan which option will be used for the side sewer.A separate utility permit for a side <br /> sewer alteration will be required to be applied for and purchased. <br /> • The garage apron is required to be paved. Gravel is not permitted for parking areas or driving surfaces. Show on <br /> the site plan that the area will be paved. <br /> To resubmit, please provide (2) sets of updated site plans addressing the 3 comments above as well as(2) completed <br /> copies of the stormwater report template. <br /> Redline comments are attached to this email. If you have any questions regarding the comments/redlines or need <br /> anything further, please directly contact me at TJorgenson@everettwa.gov. <br /> Terri Jorgenson <br /> 16 Ilm Development Technician I Permit Services <br /> 425.257.88611 3200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M-F 8:30am—3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& online resources for updates to our service during the <br /> COVID-19 pandemic. Due to limited staff and increased volumes, response times have increased and may take <br /> as long as 3—5 business days. Your patience is appreciated as we respond in the order received. Thank you <br /> and stay well. <br /> Note:[mails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />