5: Stabilize Soils <br /> The "Construction Sequence" calls for the stabilization of soils that remain unworked for <br /> certain lengths of time based on the time of year. Stabilization techniques may include <br /> but not limited to mulching, plastic sheeting or hydroseeding, notes have been added to <br /> the plan regarding protection for the stockpile area if necessary. A stockpile area has <br /> been identified on the SWPPP and is setback a minimum of 10-feet from any down slope <br /> property line or critical area. <br /> 6: Protect Slopes <br /> All disturbed slopes on site during construction are required to be protected with mulch <br /> or other means as specified in the construction sequence. No concentrated runoff or <br /> significant amounts of sheet flow will be directed to new cut or fill slopes during <br /> construction. <br /> 7: Protect Drain Inlets <br /> No new or existing culverts are proposed or affected by this project. <br /> 8: Stabilize Channels and Outlets <br /> No new channels or outlets are proposed for this site. <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. <br /> Concrete truck chutes, pumps, internals, and hand tools shall be washed out only into <br /> formed areas awaiting installation of concrete or asphalt. Unused concrete remaining <br /> in the truck and pump shall be returned to the originating batch plant for recycling. When <br /> no formed areas are available, washwater and leftover product shall be contained in a <br /> lined container and disposed of in a manner that does not violate water quality <br /> standards. All vehicles working on and around the site would need to meet the State <br /> requirements for emissions. A drip pan or other appropriate temporary containment <br /> device shall be placed at locations where leaks or spills may occur during the fueling or <br /> maintenance of machinery. <br /> 10: Control DeWatering <br /> DeWatering is not expected for this project. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the City to relocate or add BMPs as necessary as site <br /> conditions change. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> L City of Everett <br /> EVERETT Reviewed for Permit 11/18/2021 <br /> Bedle Garage 21-0421 <br /> November 2021 Page 8 <br />