Laserfiche WebLink
Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess <br /> the site conditions and construction activities that could impact the quality of stormwater, <br /> and second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. Whenever inspection and/or monitoring <br /> reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br /> actual discharge of or potential to discharge a significant amount of any pollutant, <br /> appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the <br /> site. The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or could have, <br /> a significant effect on the discharge of pollutants to waters of the state. The SWPPP <br /> shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems identified. Revisions <br /> to the SWPPP shall be completed within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces <br /> The use of dispersion BMPs for this project will allow for the installation of these features <br /> at the end of the project during final stabilization. That will protect those areas from <br /> disturbance or compaction. In addition, the organic content of the amended soils will be <br /> tested and verified prior to final project acceptance. <br /> City of Everett <br /> EVERErr Reviewed for Permit 11/18/2021 <br /> Bedle Garage 21-0421 <br /> November 2021 Page 9 <br />