My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2217 GRAND AVE 2025-05-29
>
Address Records
>
GRAND AVE
>
2217
>
2217 GRAND AVE 2025-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 10:32:27 AM
Creation date
2/3/2025 10:27:59 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2217
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess <br /> the site conditions and construction activities that could impact the quality of stormwater, <br /> and second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. Whenever inspection and/or monitoring <br /> reveals that the BMPs identified in the Construction SWPPP are inadequate, due to the <br /> actual discharge of or potential to discharge a significant amount of any pollutant, <br /> appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the <br /> site. The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or could have, <br /> a significant effect on the discharge of pollutants to waters of the state. The SWPPP <br /> shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems identified. Revisions <br /> to the SWPPP shall be completed within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces <br /> The use of dispersion BMPs for this project will allow for the installation of these features <br /> at the end of the project during final stabilization. That will protect those areas from <br /> disturbance or compaction. In addition, the organic content of the amended soils will be <br /> tested and verified prior to final project acceptance. <br /> City of Everett <br /> EVERErr Reviewed for Permit 11/18/2021 <br /> Bedle Garage 21-0421 <br /> November 2021 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.