Laserfiche WebLink
6-10.1(1) FLOW CONTROL <br /> Projects shall employ Flow Control BMPs in accordance with the following thresholds, standards, and <br /> requirements to reduce the impacts of stormwater runoff from hard surfaces and land cover conversions. <br /> Thresholds <br /> The following projects require construction of Flow Control BMPs to achieve the Flow Control Performance <br /> Standard. If a project meets any of the following thresholds. Flow Control BMPs arc required.The project <br /> proponent must demonstrate that the project does not meet any of the following thresholds for Flow Control <br /> BMPs to not be required. <br /> • Projects that have a total of 200 square feet or more of net new impervious surface,or <br /> • Projects that convert '/.acrcs or more of native vegetation, pasture, scrub/shrub.or unmaintained <br /> non-native vegetation to lawn or landscape. <br /> Design &Construction Standards I Everett, WA-Official Website <br /> — Andrew Huang, P.E., LEED AP BD+C <br /> Development Technician I Permit Services <br /> 425.257.8810, Option 6 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& online resources for updates to our service <br /> during the COVID-19 pandemic. Due to limited staff and increased volumes, response times <br /> have increased and may take as long as 3—5 business days. Your patience is appreciated as we <br /> respond in the order received. Thank you and stay well. <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br />