My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
>
Address Records
>
18TH AVE W
>
9502
>
UNIT Q
>
Plans
>
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 8:32:43 AM
Creation date
2/3/2025 2:26:40 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT Q
Permit
B2310-030
Year
2023
Notes
NEW SFR - REFRB2306-005 - UNIT Q
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAWLSPA <br />VENT PER ARCH' <br />SEE 20IS07 T` <br />VLSPACE <br />ACCESS <br />R ARCH'L <br />TYP LIND <br />ALL FRAMING OR HARDWARE <br />NOT SHOWN OR SPECIFIED <br />TO REMAIN UNCHANGED <br />i I _ <br /><I sm I J <br />SLAB -ON -GRADE <br />PER S02 pp ___ ____ _ <br />PORCH FNDN WALLS <br />BELOW PORCH SLAB <br />(SEE S02) <br />EXTENDED FRONT PORCH OPTION - ELEV. 'A' <br />,-� T. Le <br />k�T <br />co <br />f' <br />W Lu <br />LJ J <br />z Lu <br />J < <br />Q <br />z <br />OZ <br />O <br />z Q <br />z> <br />LuLu <br />w <br />J Q i <br />zLLJ <br />or� <br />QLU <br />1 <br />Lu <br />FLOOR FRAMING PLAN NOTES: <br />1. Floor Sheathing shall be'/.' thick &G (—'� Panel Span �finq 4B/29j. 3`heathing to all Framing Members and lacking balow <br />J <br />O ^ <br />LL <br />with adhesive conforming to A.P.A.Specification AFG-01. Fasten Sheathing to Framing with 0.131• El x Vi Nails or Simpson WSV <br />Q <br />#9,2v screws as follows <br />f <br />Framing, Edges 6'•oc <br />Framin Field <br />70"oc <br />1 <br />Boundaries, Blocking, Struts <br />6"oc <br />LL <br />Sea Drawings for other Sheathinq Nailing requirements. <br />Z <br />Z <br />2. Floor Framing shall be as-ndicated oa plan. Refer to General SI uch-1 Notes for other requ rements <br />O <br />3. See 10/SOfi for Simpson to USP hardware conversion tablt. <br />I- <br />CQ NQ <br />G LL <br />0 <br />U— <br />LEGEND <br />� <br />XX <br />SX.X DETAIL CALL -OUT <br />P -X SHEAR WALL BELOW PER SCHEDULE OF VS06 <br />SILL PLATE BELOW <br />Fa- <br />i <br />[ _ _ _ ] BEARING OR SHEAR WALL ABOVE <br />m <br />N <br />F <br />FOUNDATION WALL BELOW <br />W <br />RAISED FOUNDATION WALL <br />a <br />(F) FLUSH FRAMED (BOTTOM FLUSH WI BOTTOM OF FRAMINGI <br />Q <br />O <br />N <br />o <br />�] POST BELOW <br />w <br />PT, LID. BLOCK THRU FLOOR FOR POST ABOVE <br />0 1 2 4 8 <br />S03A(M) <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.